- Start
- Jul 1, 201690% CONFIDENCEfrom the source
Colosseum's Tod's-Funded Facade Restoration Unveiled After Three Years
- The first part of the Colosseum restoration, begun in September 2013, was completed, marked by an event on 1 July 2016 hosted by Tod's chairman and CEO Diego Della Valle with Italian Prime Minister Matteo Renzi[2]
- Della Valle pledged 25 million euros in 2010; 10 million had been spent by then[2]
- Work so far restored 31 arches (143,640 sq ft) plus 109,620 sq ft of travertine, added new gates and recovered a gladiator bas-relief; the stone colour had "returned to white pink"[2]
- The full restoration was expected to finish between 2020 and 2022, with night lighting planned from 2 July[2]
References 290% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]90%youtube.com/watch?v=TMStBpm7OfYyoutube.com· Posted Sep 15, 2026· Starts Jul 1, 2016 ✓· 100% of score
Happened as dated: WWD[2] reports the event of 1 July 2016 at which Diego Della Valle and Prime Minister Matteo Renzi marked the completion of the first part of the restoration, begun in September 2013. The whole project was then expected to run to 2020-2022.
- [2]85%Diego Della Valle Holds Event to Mark Colosseum Restorationwwd.com· Published Jul 1, 2016· 0% of score
Covers the 1 July 2016 event marking completion of the Tod’s-funded facade restoration.[1]
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.