- Start
- Jan 15, 201850% CONFIDENCEfrom the source
- End
- Feb 28, 201850% CONFIDENCEfrom the source
TT-Line's Ferry Peter Pan Returns to Service After a 30-Meter Lengthening
- TT-Line announced it would lengthen its 2001-built ro-pax Peter Pan by about 30 metres at German Dry Docks in Bremerhaven in early 2018[2][3]
- The ship was to be cut in two just in front of the twin scrubber-equipped funnels[3]
- The lengthening increases cargo intake by almost 25% and the vessel also gets a new bow with better fuel consumption[2][3]
- The work was expected to take two months[2]
References 373% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]50%youtube.com/watch?v=WI9D_RHlL_cyoutube.com· Posted Sep 15, 2026· Starts Jan 15, 2018 ✓· Ends Feb 28, 2018 ✓· 33% of score
Shippax[3] and Ferry Shipping News[2] report the lengthening ran from early 2018 with a return to service expected by late February 2018; no single exact redelivery date is published.
- [2]80%TT-Line to have its ro-pax PETER PAN lengthenedferryshippingnews.com· Added Sep 15, 2026· 33% of score
Ferry Shipping News confirms the early-2018 timing and cargo capacity increase from the lengthening project.
- [3]90%30-metre lengthening for TT-Line's PETER PANshippax.com· Added Sep 15, 2026· 33% of score
Shippax industry news describes the 190m-to-220m lengthening at German Dry Docks, Bremerhaven, with the midsection built by Pella Sietas.
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.