ACWA’s current project page publishes US$2.37 billion project cost for the two-plant complex: Al Shuaibah 1 (600 MWac) and Al Shuaibah 2 (2,060 MWac), totaling 2,660 MWac. One pin covers the combined budget and both built plants; the cost is not duplicated on separate phase pins. Al Shuaibah 1 and 2 solar complex: published generating capacity 2660 MW. 600 + 2,060 MW AC; whole two-plant complex ACWA’s project page lists commercial-operation milestones February 28, 2025 for ASB1 and November 30, 2025 for ASB2. Annual-report online-capacity dates differ; both belong to the recent-opening window.
Provides project identity and map location; cost and current status are evidenced separately.
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
2,060 MW total production capacity at full operational capacity (actual); Al Shuaibah 1 capacity is not stated in this source
“Shuaibah 2 independent photovoltaic solar power plant project, with a total production capacity of 2,060 megawatts, achieving full operational capacity.”
Al Shuaibah 1 certified November 2024; Al Shuaibah 2 phases 1-3 commercial operation February 2025 (actual)
“Al Shuaibah 1 Solar Photovoltaic Project in Saudi Arabia, receipt of the Commercial Operation Certificate from the Saudi Power Procurement Company, for the full project capacity.”
Both plants in commercial operation
“The commencement of commercial operations for the first, second, and third phases of the Shuaibah 2 independent photovoltaic solar power plant project”
Financing agreements signed for Al Shuaibah 1 and 2
“July 2023G: The finalization and signing of the financing agreements with the financing consortium for Al Shuaibah 1 and Al Shuaibah 2 PV projects”
Al Shuaibah 1 receives commercial operation certificate for full capacity
“Commercial Operation Certificate from the Saudi Power Procurement Company, for the full project capacity.”
Al Shuaibah 2 phases 1-3 begin commercial operation
“February 2025G: The commencement of commercial operations for the first, second, and third phases of the Shuaibah 2 independent photovoltaic solar power plant project”
Judul asli: Al Shuaibah 1 and 2: Two Operating Solar Plants
Al Shuaibah 1 dan 2 adalah pembangkit listrik tenaga surya terpisah di Provinsi Makkah. Prospektus ACWA tahun 2025 melaporkan sertifikasi komersial proyek penuh untuk pembangkit 1 pada bulan November 2024 dan operasi penuh 2.060 MW untuk pembangkit 2 pada bulan Februari 2025.[1]
Prospektus menyatakan investasi gabungan sebesar SAR 8,3 miliar. Tidak ada bagian khusus tanaman yang diberikan dari anggaran gabungan tersebut.[1]
Power generation2.66 GW · Combined 600 MW and 2,060 MW operating solar capacity. Separate plant profiles must not duplicate the combined budget. · source