Entri pertama selalu merupakan sumber pin. Keyakinan keseluruhan adalah rata-rata tertimbang dari seberapa kuat setiap referensi mendukung waktu mulai dan berakhir yang digunakan di atas; bobot sebuah referensi berkurang setengahnya untuk setiap 180 hari lebih lama dari yang terbaru.
Tanggal yang disimpan adalah perkiraan pelacakan atau penanda lintasan kapasitas, bukan hari pembukaan pasti yang terverifikasi. Status konstruksi mengikuti tanggal lingkup fisik yang disebutkan; tidak ada penyelesaian yang disimpulkan dari target yang telah berlalu.
Construction research 2026-10-24: Epoch’s[1] 2026-05-20 observation documents the identified building scope complete or operating, using physical observations or explicit delivery rather than an elapsed target date. Completed is limited to that scope. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “colored motion artifacts from cooling towers” Dated observation 2026-05-20; future trajectory rows and modeled costs are distinguished from this physical milestone.
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
Physical-stage observation dated 2026-05-20. Named completed buildings only; later expansion is not marked completed. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“colored motion artifacts from cooling towers”
Epoch’s dated 2026-05-20 assessment: colored motion artifacts from cooling towers Named completed buildings only; later expansion is not marked completed.
“colored motion artifacts from cooling towers”
Epoch estimates AI hardware: Google TPU v5e, Google TPU v5p, Google TPU v6e, and Google TPU v7 chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Google TPU v5e, Google TPU v5p, Google TPU v6e, and Google TPU v7 chips.”
Epoch dated observation: Land clearing begins.
“Land clearing begins.”
Epoch dated observation: Building 3 is operational, based off of colored motion artifacts from…
“Building 3 is operational, based off of colored motion artifacts from cooling towers.”
Judul asli: Google Bristow AI Data Center — Completed Buildings
Pengamatan Epoch pada 20-05-2026 mendokumentasikan ruang lingkup bangunan yang teridentifikasi telah selesai atau beroperasi, menggunakan pengamatan fisik atau pengiriman eksplisit, bukan tanggal target yang telah berlalu. Selesai terbatas pada ruang lingkup itu. Jumlah daya dan akselerator tetap merupakan perkiraan Epoch, bukan peringkat yang disertifikasi oleh operator. Biaya modal dolar 2025 yang dimodelkan mencakup perangkat keras komputasi dan bukan merupakan anggaran konstruksi asli sumber.
Pelatihan AI perbatasan hiperskala dan kampus inferensi yang dilacak oleh Epoch AI dengan jejak satelit beranotasi (12 bagian fisik).