Tarikh akan datang: 1 · Semua pin: 328
Microsoft SAT14 in San Antonio, Texas, United States is a frontier AI data center campus operated by Microsoft reaching 47 MW of power capacity and 45,174 H100-equivalent AI accelerators. 0
Google Lancaster in Lancaster, Ohio, United States is a frontier AI data center campus operated by Google reaching 137 MW of power capacity and 130,369 H100-equivalent AI accelerators. 0
CoreWeave Marble NC in Marble, North Carolina, United States is a frontier AI data center campus operated by CoreWeave / OpenAI reaching 65 MW of power capacity and 78,828 H100-equivalent AI accelerators. Marble is a former crypto-mining facility that Core Scientific converted to dense GPU hosting, handing the full contracted 65 MW to CoreWeave by May 2026.
Microsoft Project Osmium in Cumming, Iowa, United States is a frontier AI data center campus operated by Microsoft / OpenAI reaching 190 MW of power capacity and 155,634 H100-equivalent AI accelerators. One building reportedly contained roughly 25,000 A100s used by OpenAI to train GPT-3.5.
CoreWeave Norway in Øvrebø, Agder, Norway is a frontier AI data center campus operated by CoreWeave / OpenAI reaching 42 MW of power capacity and 50,773 H100-equivalent AI accelerators. 0
Google Pryor (North) in Pryor, Oklahoma, United States is a frontier AI data center campus operated by Google / Google DeepMind reaching 368 MW of power capacity and 636,685 H100-equivalent AI accelerators. 0
Meta Eagle Mountain in Eagle Mountain, Utah, United States is a frontier AI data center campus operated by Meta reaching 133 MW of power capacity and 151,354 H100-equivalent AI accelerators. 0
Google Arcola in Arcola, Virginia, United States is a frontier AI data center campus operated by Google reaching 77 MW of power capacity and 108,135 H100-equivalent AI accelerators. 0
CoreWeave Dalton 1 & 2 in Dalton, Georgia, United States is a frontier AI data center campus operated by CoreWeave / OpenAI reaching 28 MW of power capacity and 32,239 H100-equivalent AI accelerators. Core Scientific bought the Dalton site as a vacant factory in 2018, and by 2021 it was already described as a DGX-Ready AI facility.
Oracle Batam in Batam, Riau Islands, Indonesia is a frontier AI data center campus operated by Oracle / Tencent reaching 72 MW of power capacity and 84,386 H100-equivalent AI accelerators. 0