Energy · Verificado em 2026-11-02
Apenas a etapa informada é destacada. Os números e datas distinguem planos de resultados demonstrados.
$1 billion to $1.5 billion
“an investment of $1 billion to $1.5 billion”
1,500-2,000 construction; 150-200 permanent
“create an estimated 1,500 to 2,000 construction jobs and 150-200 permanent positions”
569 acres
“a 569-acre site adjacent to the AgriTech Park”
500-600 MW
“Ardent is requesting 500-600 megawatts critical load from NorthWestern”
Project announced by GFDA and Ardent
“a 569-acre site adjacent to the AgriTech Park”
Proposal reported off
“cannot proceed further without NorthWestern's cooperation”
Full campus buildout (planned, not realized)
“The full campus buildout is projected by 2030.”
Este pin acompanha as notícias: mostra o que se sabe agora, e aqui está o que mudou e o que motivou a mudança.
Editadopor @ThePinGang
The Project Cardinal HyperscaleAtlanta-based Ardent TAC Data Center isCenters proposed a planned 600 MW zero-carbon compute campus located near campus on a 569-acre site beside the AgriTech Park in Great Falls in Cascade County, Montana. Strategically positioned adjacent to major hydroelectric generation along the Missouri River and regional 230 kV transmission infrastructure, Falls, requesting 500-600 MW of critical load from NorthWestern Energy at a stated $1-1.5 billion investment. The Electric reported on 18 November 2025 that the facility provides high-reliability, renewable-powered capacity for large-scale enterprise artificial intelligence infrastructure.proposal is off because power would not meet the developer's timetable.
Campus Compute Scale: 600 MW high-performance computing campus covering over 400 acres of master-planned industrial acreage. Hydroelectric Clean Energy: Powered through bilateral clean power agreements backed by Montana hydroelectricThe Great Falls Development Alliance announced the proposal in June 2025: a 569-acre site adjacent to the AgriTech Park, a $1 billion to $1.5 billion investment, 1,500-2,000 construction jobs and wind generation assets. Advanced Electrical Topology: Dual on-site 230 kV substations 150-200 permanent positions. Ardent asked NorthWestern Energy for 500-600 MW of critical load; zoning, permitting and power were expected to take 12-18 months, with diverse transmission tie-ins first phases online late 2027 to the NorthWestern Energy bulk grid. Timeline: Environmental impact scoping in 2026; site civil infrastructure in 2027; Phase 1 energization planned for December 2028.early 2028 and full buildout by 2030 (all planned, never started). On 18 November 2025 The Electric reported the proposed data center project is off after power was not going to meet the developer's timetable.
Fotos de leitores, separadas das mídias com fontes do pin. Avalie o que você comeu ou viu e, em um pin de restaurante, marque os pratos direto na sua foto.
A primeira entrada é sempre a fonte do pin. A confiança geral é uma média ponderada de quanto cada referência sustenta os horários de início e fim usados acima; uma referência conta metade a cada 180 dias a mais em relação à mais recente.
A retirada foi relatada pelo The Electric (Great Falls) em 18/11/2025; as datas de construção anteriores eram apenas projeções do desenvolvedor e nunca foram realizadas.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
Título original: Project Cardinal: Ardent TAC 500-600 MW Data Center Campus Proposal in Great Falls, Cascade County, Montana (Withdrawn)
Power usage600 MW · source
Energy used3.15 TWh a year at most, calculated from the megawatts · Calculated from MW capacity at 60% load factor · source