Start (estimated): Network Rail’s[4] Forth Bridge history records construction began in 1883 (placed at 1883-01-01). Completion: Network Rail confirms the Forth Bridge formally opened on 4 March 1890.
The Forth Bridge, a railway cantilever spanning the Firth of Forth in Scotland, was formally opened by the Prince of Wales on 4 March 1890, some months after the structure itself was finished in November 1889. Designed by John Fowler and Benjamin Baker and built by Sir William Arrol & Co., it was Britain's first major all-steel structure and the world's longest cantilever bridge span.
≈₽346.2M