McCormick Place West Building, 2301, South Indiana Avenue, Motor Row, Near South Side, Chicago, South Chicago Township, Cook County, Illinois, 60616, United StatesSalesforce
Confirmed Phase II study publication, not construction or commissioning.[1]
PJM’s June 3, 2026 Phase II study identifies Cassius Blue Solar LLC in Sussex County, Virginia: 85 MW / 340 MWh storage addition; 479 MW is total facility scope, not this battery rating.
Confirmed Phase II report release, not commercial operation or agreement execution.[1]
PJM’s June 3, 2026 Phase II study identifies Steward Creek Solar LLC’s AG2-660 in Lee County: zero added energy MW, 20 MW added capacity credit and a proposed 200 MWh / four-hour storage specification. The shared solar facility has 600 MW MFO.
Confirmed Phase II report release, not actual commissioning.[1]
PJM’s June 3, 2026 Phase II study names Monarch Grid LLC’s AG2-545 at Silver Lake 345 kV in McHenry County: a 400 MW storage uprate, 160 MW capacity credit and proposed 1,600 MWh / four-hour class. Physical interconnection study is available.
The pin marks the June 3, 2026 study release. Neither its 2028 basecase nor a transmission-upgrade date is an established COD.[1]
PJM identifies Zeus storage, LLC’s AG2-571 in Brunswick County as a 100 MW / 400 MWh addition to the 400 MW solar request AG2-570. The 500 MW figure is combined facility capability.
The pin marks publication of the June 3, 2026 studies. Their 2028 basecase is not a commissioning date; the former December 2029 COD is removed.[1]
PJM’s June 2026 studies identify Oak Run Solar Project, LLC’s two storage requests, AG2-106 and AG2-107, at Marysville–Flatlick in Madison County, Ohio. Each specifies 150 MW of capacity rights and 600 MWh; 800 MW is the combined facility capability.
The event is the June 3, 2026 study release, not a confirmed 2028 commissioning.[1]
PJM’s June 2026 study identifies Scout Solar DevCo LLC’s Cordova request AG2-675 as an 80 MW / 320 MWh, four-hour storage addition sharing solar request AG1-462’s interconnection in Rock Island County, Illinois.
Date of developer-reported review delay in WIVB, not commercial operation.[1]
WIVB’s June 3 report identifies Riverview Innovation and Technology Campus at the former Tonawanda Coke site, with 300 MW proposed demand and 500000 sqft. The developer delayed site-plan review while intending to continue; the prior Super DC/Huntley-site attribution is unsupported.
The confirmed milestone is the June 3, 2026 study release; no new-battery COD is established.[1]
PJM’s June 2026 study identifies Aurora Generation, LLC’s AH1-563 as a 150 MW / 600 MWh, four-hour addition at Aurora E.C. The 1,206 MW figure is combined gas/storage capability, not standalone battery capacity.
Confirmed announced milestone: Developer published its grand-opening announcement June 4, 2026. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
Atlantic Square is a 616-apartment mixed-income tower in Overtown with affordable, workforce and market-rate housing, near Brightline, Metrorail and Metromover. Developer published its grand-opening announcement June 4, 2026. Published rents: Workforce plans, operator FAQ starting price From $1,980.
Parc del Fòrum, 1-3, Passeig del Taulat, Diagonal Mar i el Front Marítim del Poblenou, Sant Martí, Barcelona, Barcelonès, Barcelona, Catalonia, 08019, SpainPrimavera Sound