预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 94%总体可信度: 94%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 2 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度不低于 75% 的图钉13天后
Estimated commercial operation target of November 2026 based on MISO generator interconnection queue schedule and state regulatory filings.[1]MISO regional transmission interconnection development of the Bee Hollow Clean Solar Center in St. Clair County, Illinois. Providing 150 MWac of renewable power, the utility-scale solar project feeds into Ameren Illinois transmission lines to power metro-east Illinois communities with clean, locally generated electricity.
$170M