SR Magnolia Clean Solar Farm, US Highway 45 Alternate Corridor, Aberdeen, Monroe County, MS 39730Silicon Ranch
预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 95%总体可信度: 95%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 2 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度不低于 75% 的图钉225天后
TVA[2] Green Invest interconnection queue and Silicon Ranch[1] project schedules target June 2027 commercial operation for the 160 MWac SR Magnolia Solar Farm.Silicon Ranch and Tennessee Valley Authority (TVA) development of the SR Magnolia Clean Solar Farm in Monroe County, Mississippi. Delivering 160 MWac of regenerative utility-scale solar generation, the project connects to the 161 kV TVA transmission network to power northeastern Mississippi commercial and industrial off-takers.
$180M