Energy: battery storage · تم التحقق 2026-10-30
تُبرز المرحلة المعلنة فقط. تميز الأرقام والتواريخ بين المخطط والمثبت.
400 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"PERE MARQUETTE","summerNetMW":400.0”
2030-06-30; requested date only, not an achieved opening.
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; PERE MARQUETTE.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
يتابع هذا الدبوس الأخبار: فهو يعرض ما هو معروف الآن، وهنا ما تغيّر وما الذي أدى إليه.
تم التعديلبواسطة @ThePinGang
Consumers Energy development of the Pere Marquette Clean Energy Storage Center in Mason County, Michigan. ProvidingJ4093 is a 400 MW / 1,600 MWh of utility-scale four-hour battery storage, the system interfaces with western Michigan transmission to balance fluctuating Lake Michigan wind generation and support grid reliability following coal plant retirements.battery storage interconnection request in Mason, MI. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date.
Consumers Energy progressed state regulatory filings for the Pere Marquette Clean Energy Storage CenterJ4093 is a 400 MW battery storage interconnection request in Mason County. Supplies 400 MW / 1,600 MWh of four-hour duration battery energy storage capacity. Represents an estimated 420 million USD clean infrastructure investment in western Michigan. Interfaces with MISO high-voltage transmission lines near Lake Michigan shores. Balances regional wind generation and replaces capacity following the retirement of legacy coal facilities. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.Mason, MI. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date. The point of interconnection is PERE MARQUETTE. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
تم التعديلبواسطة @ThePinGang
… capacity following the retirement of legacy coal facilities. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.
تم التعديلبواسطة @ThePinGang
صور من القرّاء، منفصلة عن وسائط الدبوس الموثّقة بمصادر. قيّم ما أكلته أو رأيته، وفي دبوس المطعم وسّم الأطباق مباشرة على صورتك.
المدخل الأول هو دائمًا مصدر الدبوس. الثقة الإجمالية متوسط مرجّح لمدى قوة دعم كل مرجع لوقتَي البدء والانتهاء المستخدمين أعلاه؛ ويقل وزن المرجع إلى النصف عن كل 180 يومًا يسبق بها أحدث مرجع.
هل ينقص شيء أو يوجد خطأ؟ قله بكلماتك: رابط يدعم هذا الدبوس، أو تاريخ بدء أو انتهاء مختلف مع السبب، أو معلومة ينقصها أو يخطئ فيها. يفحص الذكاء الاصطناعي ذلك بمقارنته بمصادر هذا الدبوس، ويبحث عن مصادر أفضل، ويضيف أي صفحة تدعم كلامك. وتبقى مصادر الدبوس نفسه الأثقل وزنًا. كما تُفحص الصورة التي تُظهر شيئًا آخر أو تُظهره بشكل سيئ، فتُنزَّل أو تُستبدل.
العنوان الأصلي: Pere Marquette: 400 MW Battery Interconnection Request J4093
Power storage400 MW · J4093: 400 MW requested battery storage. Queue status: Active. Requested date: 2030-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source