Energy: photovoltaic generation · تم التحقق 2026-10-30
تُبرز المرحلة المعلنة فقط. تميز الأرقام والتواريخ بين المخطط والمثبت.
199 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Robinsonville 230 kV","summerNetMW":199.0”
2024-12-01; requested date only, not an achieved opening.
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Robinsonville 230 kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
يتابع هذا الدبوس الأخبار: فهو يعرض ما هو معروف الآن، وهنا ما تغيّر وما الذي أدى إليه.
تم التعديلبواسطة @ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Robinsonville Clean Solar CenterJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto County, Mississippi. Delivering 199 MWac of clean photovoltaic power, the facility ties to the 230 kV electric grid to provide zero-carbon electricity to northwestern Mississippi communities and commercial developments.DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental assessments for the Robinsonville Clean Solar Center in DeSoto County, Mississippi. Deploys 199 MWac of clean photovoltaic power across northwest Mississippi. RepresentsJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a 220 million USD clean energy infrastructure investment. Interfaces directly with theplanning date. The point of interconnection is Robinsonville 230 kV electric grid along the US Highway 61 corridor. Supplies zero-carbon electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
تم التعديلبواسطة @ThePinGang
… electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
تم التعديلبواسطة @ThePinGang
صور من القرّاء، منفصلة عن وسائط الدبوس الموثّقة بمصادر. قيّم ما أكلته أو رأيته، وفي دبوس المطعم وسّم الأطباق مباشرة على صورتك.
المدخل الأول هو دائمًا مصدر الدبوس. الثقة الإجمالية متوسط مرجّح لمدى قوة دعم كل مرجع لوقتَي البدء والانتهاء المستخدمين أعلاه؛ ويقل وزن المرجع إلى النصف عن كل 180 يومًا يسبق بها أحدث مرجع.
هل ينقص شيء أو يوجد خطأ؟ قله بكلماتك: رابط يدعم هذا الدبوس، أو تاريخ بدء أو انتهاء مختلف مع السبب، أو معلومة ينقصها أو يخطئ فيها. يفحص الذكاء الاصطناعي ذلك بمقارنته بمصادر هذا الدبوس، ويبحث عن مصادر أفضل، ويضيف أي صفحة تدعم كلامك. وتبقى مصادر الدبوس نفسه الأثقل وزنًا. كما تُفحص الصورة التي تُظهر شيئًا آخر أو تُظهره بشكل سيئ، فتُنزَّل أو تُستبدل.
العنوان الأصلي: Robinsonville: 199 MW Solar Interconnection Request J2047
Power generation199 MW · J2047: 199 MW requested photovoltaic generation. Queue status: Done. Requested date: 2024-12-01. Not current measured generation; No annual energy or battery MWh inferred. · source