Construction research 2026-10-24: Epoch’s[1] 2026-02-14 observation documents remaining physical construction/installation for this named buildout. In Progress does not complete earlier operating buildings or future capacity. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “All buildings have begun construction” Dated observation 2026-02-14; future trajectory rows and modeled costs are distinguished from this physical milestone.
هل ينقص شيء أو يوجد خطأ؟ قله بكلماتك: رابط يدعم هذا الدبوس، أو تاريخ بدء أو انتهاء مختلف مع السبب، أو معلومة ينقصها أو يخطئ فيها. يفحص الذكاء الاصطناعي ذلك بمقارنته بمصادر هذا الدبوس، ويبحث عن مصادر أفضل، ويضيف أي صفحة تدعم كلامك. وتبقى مصادر الدبوس نفسه الأثقل وزنًا. كما تُفحص الصورة التي تُظهر شيئًا آخر أو تُظهره بشكل سيئ، فتُنزَّل أو تُستبدل.
Epoch AI satellite-imagery notes, in date order. · المصدر
Physical-stage observation dated 2026-02-14. Campus buildout remains under construction; already operating buildings do not complete the remaining work. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“All buildings have begun construction”
Epoch’s dated 2026-02-14 assessment: All buildings have begun construction Campus buildout remains under construction; already operating buildings do not complete the remaining work.
“All buildings have begun construction”
Epoch estimates AI hardware: Nvidia H100 chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Nvidia H100 chips.”
Epoch dated observation: Land clearing begins by Peterson Companies for Stack Infrastructure,…
“Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the news and visible on satellite imagery.”
Epoch dated observation: All buildings have begun construction (with groundwork starting for AI…
“All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery.”
العنوان الأصلي: STACK Infrastructure NVA02 AI Data Center Buildout
توثق ملاحظة Epoch's 2026-02-14 البناء/التثبيت المادي المتبقي لهذا البناء المسمى. قيد التقدم لا يكمل المباني التشغيلية السابقة أو القدرة المستقبلية. تظل أعداد القوة والمسرع تقديرات زمنية، وليست تصنيفًا معتمدًا من قبل المشغل. تتضمن التكاليف الرأسمالية النموذجية البالغة 2025 دولارًا أجهزة حسابية وليست ميزانية إنشاءات محلية المصدر.
مجمع فائق النطاق لتدريب الذكاء الاصطناعي المتقدم والاستدلال، تتبعه Epoch AI مع تحديد نطاق مكوناته على صور الأقمار الصناعية (11 مكونًا ماديًا).