Nuclear energy: two-unit EPR power station under construction · تم التحقق 2026-10-29
تُبرز المرحلة المعلنة فقط. تميز الأرقام والتواريخ بين المخطط والمثبت.
£35 billion in 2015 prices (c. £48 billion in 2026 prices)
“£35 billion in 2015 prices (c. £48 billion in 2026 prices)”
Two EPR units; the page states a total of 3,200 MWe (nameplate 3,260 MWe in its infobox)
“two pressurized water reactors of the EPR design scheduled to produce a total of 3,200 MWe.”
Unit 1 projected to come online in 2030
“Unit 1 of the station is projected to come online in 2030.”
Under construction; the first reactor concrete pour began 11 December 2018
“The approximate 2,000 cubic metres (71,000 cu ft) concrete pour for the first reactor started on 11 December 2018.”
Concrete pour for the first reactor begins
“The approximate 2,000 cubic metres (71,000 cu ft) concrete pour for the first reactor started on 11 December 2018.”
Unit 1 projected to come online
“Unit 1 of the station is projected to come online in 2030.”
يتابع هذا الدبوس الأخبار: فهو يعرض ما هو معروف الآن، وهنا ما تغيّر وما الذي أدى إليه.
تم التعديلبواسطة @ThePinGang
… and excluded expansion proposals are not additive capacity. Verified project media and credits The reactor makes its way into the second reactor building. Credit: EDF / Hinkley Point C media team. Source and gallery; original media. The world’s largest crane, “Big Carl” has lifted the dome onto the second reactor building. Credit: EDF / Hinkley Point C media team. Source and gallery; original media.
تم التعديلبواسطة @ThePinGang
تم التعديلبواسطة @ThePinGang
First reactor target: 2030; second reactor later. 3,300 MW generating capacity; About GBP 35 billion published project cost (2015 GBP). Under construction. Capacity and cost describe the whole two-reactor project.
Estimated buildout target through 2030 Unit 1 in 2030; Unit 2 later. EDF’s February 20, 2026 presentation organises Hinkley Unit 1 for operation in 2030 and Unit 2 twelve months later. The 3.3 GW capacity and GBP35 billion estimate in 2015 sterling cover both reactors; neither is represented as wholly delivered by 2030. Construction is verified; the completion date remains an estimate. The timeline marker represents the published target year/month, not a confirmed opening day. This is a first-reactor milestone and is excluded from the 12-project full-completion count. Whole-project costs and both-reactor capacity are not allocated to Unit 1. Published cost and electrical output Project cost / …
تم التعديلبواسطة @ThePinGang
Britain's first new nuclear plant in a generation, intended to supply roughly 7% of UK electricity. Estimated date, repeatedly revised.3,300 MW generating capacity; About GBP 35 billion published project cost (2015 GBP). Under construction.
Hinkley Point C in Somerset is two EPR reactors (2 x 1,630 MWe, 3,260 MWe), owned 76.69% by EDF EnergyPublished cost and 23.31% by China General Nuclear, operated by NNB Generation Company Construction beganelectrical output Project cost / investmentAbout GBP 35 billionCost scopeCompletion estimate in March 2017 with completion then expected in 2025; delays are attributed to COVID-19, Brexit and budget overrunsconstant 2015 GBP; not nominal 2026 GBPCost source date2026-02-20Electrical generating capacity3,300 MW — EDF confirmed lower-than-expected productivity in electromechanical installation, so Unit 1 start-up moves to 2030, a year after the previous best case (2029), two years behind the 2027 revised timetablepresentation rounded electric project rating: 3.3 GWVerified project stageUnder constructionProject-specific research EDF’s February 20, 2026 results presentation labels Hinkley Point C as a 3.3 GW EPR project and five behind the original 2025 Cost is £35bnestimates completion cost at £35 billion in 2015 prices, about £48bn at today's prices (up £1.4bn), almost doublesterling. A 12-month delay could add around £1 billion in the initial £18bn estimate Progress per EDF results: Unit 1 civil works 94% by concrete volume, 24 primary loop welds finished in January, safety injection pumps installed;same price basis. Both reactors have documented construction progress; Unit 1 is organized for 2030, with Unit 2 dome lifted and reactor pressure vessel delivered; the M&E programmetwelve months later. This is still behind Hinkley received £1.6bn from Sizewell C for expertise Additional August 2026 inventory evidence GEM August 2026 snapshot: under construction. 3440 MW sum of published phase ratings (ratings may mix solar DC/AC). Technologies: Nuclear. Compare phase coverage and AC/DC, nameplate and net ratings before combining source figures. This inventory view is not extra capacity to add to the existing project total. Inventory unit details — gem-L100000500375 Additional source view; compare phase coverage and rating conventions before combining figures. C1 (G100000501035): reported rating 1720 MW; pressurized water reactor; status construction; reported year 2029; solar rating not specified/not applicable. C2 (G100000501036):actual construction, not an announcement-only proposal. Published project-specific cost for Hinkley Point C: GBP 3.5e+10. Basis: Completion estimate in constant 2015 GBP; not nominal 2026 GBP. Published electric generating project rating for Hinkley Point C: 3300 MW. Basis: EDF presentation rounded electric project rating: 3.3 GW. Scope and evidence Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported rating 1720 MW; pressurized water reactor; status construction; reported year 2030; solar rating plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not specified/not applicable.additive capacity.
تم التعديلبواسطة @ThePinGang
… capacity to add to the existing project total. Inventory unit details — gem-L100000500375 Additional source view; compare phase coverage and rating conventions before combining figures. C1 (G100000501035): reported rating 1720 MW; pressurized water reactor; status construction; reported year 2029; solar rating not specified/not applicable. C2 (G100000501036): reported rating 1720 MW; pressurized water reactor; status construction; reported year 2030; solar rating not specified/not applicable.
تم التعديلبواسطة @ThePinGang
… Hinkley received £1.6bn from Sizewell C for expertise Additional August 2026 inventory evidence GEM August 2026 snapshot: under construction. 3440 MW sum of published phase ratings (ratings may mix solar DC/AC). Technologies: Nuclear. Compare phase coverage and AC/DC, nameplate and net ratings before combining source figures. This inventory view is not extra capacity to add to the existing project total.
صور من القرّاء، منفصلة عن وسائط الدبوس الموثّقة بمصادر. قيّم ما أكلته أو رأيته، وفي دبوس المطعم وسّم الأطباق مباشرة على صورتك.
المدخل الأول هو دائمًا مصدر الدبوس. الثقة الإجمالية متوسط مرجّح لمدى قوة دعم كل مرجع لوقتَي البدء والانتهاء المستخدمين أعلاه؛ ويقل وزن المرجع إلى النصف عن كل 180 يومًا يسبق بها أحدث مرجع.
الهدف المنشور: الوحدة 1 في 2030؛ والوحدة 2 لاحقًا. الإنشاء موثّق، لكن هذا الموعد المستقبلي للاكتمال/التشغيل تقديري. التاريخ علامة زمنية لسنة/نهاية شهر وليس يوم افتتاح دقيقًا مؤكدًا. المصدر: https://www.edf[3].fr/sites/groupe/files/2026-02/annual-results-edf-2025-presentation-2026-02-20.pdf
The reactor makes its way into the second reactor building.[1]
Published project-specific cost for Hinkley Point C: GBP 3.5e+10. Basis: Completion estimate in constant 2015 GBP; not nominal 2026 GBP. Published electric generating project rating for Hinkley Point C: 3300 MW. Basis: EDF presentation rounded electric project rating: 3.3 GW.
هل ينقص شيء أو يوجد خطأ؟ قله بكلماتك: رابط يدعم هذا الدبوس، أو تاريخ بدء أو انتهاء مختلف مع السبب، أو معلومة ينقصها أو يخطئ فيها. يفحص الذكاء الاصطناعي ذلك بمقارنته بمصادر هذا الدبوس، ويبحث عن مصادر أفضل، ويضيف أي صفحة تدعم كلامك. وتبقى مصادر الدبوس نفسه الأثقل وزنًا. كما تُفحص الصورة التي تُظهر شيئًا آخر أو تُظهره بشكل سيئ، فتُنزَّل أو تُستبدل.
العنوان الأصلي: Hinkley Point C — first reactor target 2030
الوحدة 1 في 2030؛ والوحدة 2 لاحقًا. تنظّم عروض EDF المقدَّمة في 20 فبراير 2026 تشغيل الوحدة 1 في هينكلي عام 2030 والوحدة 2 بعد اثني عشر شهرًا. تشمل القدرة البالغة 3.3 غيغاواط وتقدير 35 مليار جنيه إسترليني بأسعار 2015 كلا المفاعلين؛ ولا يُقدَّم أي منهما على أنه سيكتمل بالكامل بحلول 2030.[3]
الإنشاء مؤكَّد؛ أما موعد الاكتمال فلا يزال تقديريًا. تمثّل العلامة الزمنية السنة/الشهر المستهدف المنشور، وليس يوم افتتاح مؤكدًا.
هذا موعد خاص بالمفاعل الأول ويُستبعد من إحصاء المشاريع الاثني عشر المكتملة بالكامل. ولا تُنسب تكاليف المشروع بأكمله ولا قدرة المفاعلين إلى الوحدة 1.
يصف عرض نتائج EDF بتاريخ 20 فبراير 2026 مشروع هينكلي بوينت C بأنه مشروع EPR بقدرة 3.3 غيغاواط، ويقدّر تكلفة الاكتمال بـ 35 مليار جنيه إسترليني بأسعار 2015. وقد يضيف تأخير مدته 12 شهرًا نحو مليار جنيه إسترليني على الأساس السعري نفسه. ويوثَّق تقدّم الإنشاء في كلا المفاعلين؛ والوحدة 1 مقرَّرة لعام 2030 والوحدة 2 بعدها بـ 12 شهرًا. هذا إنشاء فعلي وليس مقترحًا مجرد إعلان.[3]
التكلفة المنشورة الخاصة بمشروع Hinkley Point C: GBP 3.5e+10. الأساس: تقدير عند الاكتمال بالجنيه الإسترليني الثابت لعام 2015؛ وليس بالجنيه الاسمي لعام 2026. القدرة الكهربائية المنشورة الخاصة بمشروع Hinkley Point C: 3300 ميغاواط. الأساس: القدرة الكهربائية الاسمية المقرّبة للمشروع بحسب عرض EDF: 3.3 غيغاواط.[3]
لا يُحتفظ إلا بالمشاريع الموثَّق فيها إنشاء مادي أو تشغيل تجريبي أو افتتاح في 2025–2026 والتي نُشرت لها تكاليف وقدرة كهربائية خاصة بالمشروع. تستخدم التكاليف النطاق والعملة المنشورين؛ ولا توجد تقديرات مرجعية ولا تحويلات عملة. الميغاواط قدرة طاقة وليس إنتاج الكهرباء السنوي. والطاقة السنوية المتوقعة، حيثما ذُكرت، توقّع. نقطة الخريطة موقع مُبلَّغ عنه للمحطة/المشروع وقد تكون تقريبية. وعروض الجرد المطابقة ومقترحات التوسعة المستبعدة ليست قدرة قابلة للجمع.
المفاعل يشق طريقه إلى مبنى المفاعل الثاني. الإسناد: EDF / Hinkley Point C media team. المصدر والمعرض؛ الوسيط الأصلي.
رفعت أكبر رافعة في العالم «بيغ كارل» القبة فوق مبنى المفاعل الثاني. الإسناد: EDF / Hinkley Point C media team. المصدر والمعرض؛ الوسيط الأصلي.