Angekündigt
Energy: battery storage · Geprüft am 2026-10-30
Nur die gemeldete Phase ist hervorgehoben. Angaben und Termine unterscheiden geplante und nachgewiesene Zustände.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Towerline","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Towerline.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
NextEra Energy Resources development of the Towerline Clean Energy Storage Center in Tazewell County, Illinois. EncompassingJ3298 is a 200 MW / 800 MWh of utility-grade battery storage, the system interfaces with high-voltage 138 kV transmission lines near Peoria to provide rapid-response frequency stability and support regional decarbonization targets.battery storage interconnection request in Tazewell, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
NextEra Energy Resources filed zoning and transmission applications for the Towerline Clean Energy Storage Center. Provides 200 MW / 800 MWh of four-hour grid-tied battery storage in Tazewell County, Illinois. RepresentsJ3298 is a 200 MW battery storage interconnection request in Tazewell, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD clean energy capital development near the Peoria industrial center. Interconnects to 138 kV high-voltage circuits under MISO regional queue review. Supplies rapid-response capacity firming, local transmission relief, and decarbonization support. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Towerline. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Bearbeitetvon @ThePinGang
… capacity firming, local transmission relief, and decarbonization support. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Bearbeitetvon @ThePinGang
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Towerline: 200 MW Battery Interconnection Request J3298
Power storage200 MW · J3298: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source