400 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"PERE MARQUETTE","summerNetMW":400.0”
2030-06-30; requested date only, not an achieved opening.
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; PERE MARQUETTE.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J4093","queueDate":"2025-10-06T04:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
Consumers Energy development of the Pere Marquette Clean Energy Storage Center in Mason County, Michigan. ProvidingJ4093 is a 400 MW / 1,600 MWh of utility-scale four-hour battery storage, the system interfaces with western Michigan transmission to balance fluctuating Lake Michigan wind generation and support grid reliability following coal plant retirements.battery storage interconnection request in Mason, MI. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date.
Consumers Energy progressed state regulatory filings for the Pere Marquette Clean Energy Storage CenterJ4093 is a 400 MW battery storage interconnection request in Mason County. Supplies 400 MW / 1,600 MWh of four-hour duration battery energy storage capacity. Represents an estimated 420 million USD clean infrastructure investment in western Michigan. Interfaces with MISO high-voltage transmission lines near Lake Michigan shores. Balances regional wind generation and replaces capacity following the retirement of legacy coal facilities. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.Mason, MI. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date. The point of interconnection is PERE MARQUETTE. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Bearbeitetvon @ThePinGang
… capacity following the retirement of legacy coal facilities. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.
Bearbeitetvon @ThePinGang
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Pere Marquette: 400 MW Battery Interconnection Request J4093
Power storage400 MW · J4093: 400 MW requested battery storage. Queue status: Active. Requested date: 2030-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source