200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"BEACON","summerNetMW":200.0”
2027-09-10; requested date only, not an achieved opening.
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; BEACON.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
MISO regional transmission interconnection development of the Beacon Clean Energy Storage Facility in Mahaska County, Iowa. SupplyingJ3551 is a 200 MW / 800 MWh of lithium-ion energy storage, the facility connects to regional transmission lines near Oskaloosa to absorb surplus wind generation and strengthen southeastern Iowa electrical infrastructure.battery storage interconnection request in Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date.
Developers progressed regulatory filings for the Beacon Clean Energy Storage Facility near OskaloosaJ3551 is a 200 MW battery storage interconnection request in Mahaska County, Iowa. Supplies 200 MW / 800 MWh of grid-scale four-hour battery energy storage. Represents an estimated 210 million USD private clean power investment in southeastern Iowa. Connects to regional high-voltage transmission lines within the MISO market footprint. Absorbs surplus regional wind generation and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date. The point of interconnection is BEACON. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Bearbeitetvon @ThePinGang
… and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Beacon: 200 MW Battery Interconnection Request J3551
Power storage200 MW · J3551: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-09-10. Not current measured generation; No annual energy or battery MWh inferred. · source