250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"TWINKLETOWN 230 KV","summerNetMW":250.0”
2025-02-22; requested date only, not an achieved opening.
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; TWINKLETOWN 230 KV.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Twinkletown Clean Energy Storage Center in DeSoto County, Mississippi. DeliveringJ2091 is a 250 MW / 1,000 MWh of advanced battery storage connected to the 230 kV bulk electric system, the facility provides vital peak shaving and voltage regulation for the rapidly expanding Memphis metropolitan industrial corridor.interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental and engineering reviews for the Twinkletown Clean Energy Storage CenterJ2091 is a 250 MW battery storage interconnection request in DeSoto County, Mississippi. Delivers 250 MW / 1,000 MWh of advanced utility-scale battery storage. Represents a 250 million USD clean energy capital development in northern Mississippi. Interconnects directly to theDeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date. The point of interconnection is TWINKLETOWN 230 kV bulk transmission system along State Highway 302. Supplies essential peak shaving and voltage regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.KV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Bearbeitetvon @ThePinGang
… regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.
Bearbeitetvon @ThePinGang
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Twinkletown: 250 MW Battery Interconnection Request J2091
Power storage250 MW · J2091: 250 MW requested battery storage. Queue status: Done. Requested date: 2025-02-22. Not current measured generation; No annual energy or battery MWh inferred. · source