Angekündigt
Energy: battery storage · Geprüft am 2026-10-30
Nur die gemeldete Phase ist hervorgehoben. Angaben und Termine unterscheiden geplante und nachgewiesene Zustände.
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Wabaco","summerNetMW":250.0”
2030-06-30; requested date only, not an achieved opening.
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Wabaco.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
MISO regional transmission interconnection development of the Wabaco Clean Energy Storage Center in Wabasha County, Minnesota. SupplyingJ3848 is a 250 MW / 1,000 MWh of grid-scale battery storage along the Upper Mississippi River transmission corridor, the facility stores regional wind and solar generation to accelerate Minnesota's transition to 100% carbon-free electricity.interconnection request in Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date.
Xcel Energy filed regulatory petitions for the Wabaco Clean Energy Storage CenterJ3848 is a 250 MW battery storage interconnection request in Wabasha County, Minnesota. Supplies 250 MW / 1,000 MWh of four-hour grid-scale battery storage capacity. Represents an estimated 250 million USD clean energy infrastructure investment. Interconnects with MISO high-voltage transmission lines along the Upper Mississippi River corridor. Captures regional wind and solar generation to accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date. The point of interconnection is Wabaco. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Bearbeitetvon @ThePinGang
… accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Wabaco: 250 MW Battery Interconnection Request J3848
Power storage250 MW · J3848: 250 MW requested battery storage. Queue status: Active. Requested date: 2030-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source