Angekündigt
Energy: battery storage · Geprüft am 2026-10-30
Nur die gemeldete Phase ist hervorgehoben. Angaben und Termine unterscheiden geplante und nachgewiesene Zustände.
100 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"WEBB","summerNetMW":100.0”
2027-06-01; requested date only, not an achieved opening.
“"projectNumber":"S1116","queueDate":"2025-08-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; WEBB.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"S1116","queueDate":"2025-08-31T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"S1116","queueDate":"2025-08-31T04:00:00+00:00","inService":"2027-06-01T04:00:00+00:00"”
Dieser Pin folgt den Nachrichten: Er zeigt den aktuellen Stand, und hier steht, was sich geändert hat und wodurch.
Bearbeitetvon @ThePinGang
MISO regional transmission interconnection development of the Webb Clean Energy Storage Center in Tallahatchie County, Mississippi. DeliveringS1116 is a 100 MW / 400 MWh of utility-scale lithium-ion battery storage, the facility connects to the 115 kV Webb substation to balance Delta solar generation and reinforce regional grid reliability.battery storage interconnection request in Tallahatchie, MS. The grid operator lists its queue status as Active. The requested in-service date is 2027-06-01; this is a planning date.
Entergy Mississippi advanced MISO interconnection filings for the Webb Clean Energy Storage Center in Tallahatchie County, Mississippi. DeliversS1116 is a 100 MW / 400 MWh of four-hour lithium-ion utility battery storage capacity. Represents an estimated 120 million USD clean grid infrastructure investment in the Mississippi Delta. Interconnects directly with the 115 kV Webb substation along the US Highway 49E transmission corridor. Stores utility-scale Delta solar output to provide peak-hour dispatchable capacity and regional voltage stability. Timeline: planned utility-scale battery storage project targeting commercial operation in June 2027 (estimated) per MISO generator interconnection queue and Mississippi PSC resource filings.interconnection request in Tallahatchie, MS. The grid operator lists its queue status as Active. The requested in-service date is 2027-06-01; this is a planning date. The point of interconnection is WEBB. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Fotos von Lesern, getrennt von den belegten Medien des Pins. Bewerte, was du gegessen oder gesehen hast, und markiere bei einem Restaurant-Pin die Gerichte direkt auf deinem Foto.
Der erste Eintrag ist immer die Quelle des Pins. Die Gesamtsicherheit ist ein gewichteter Durchschnitt, wie fest jeder Beleg die oben verwendeten Start- und Endzeiten stützt; ein Beleg zählt für je 180 Tage, die er älter ist als der neueste, nur halb so viel.
Fehlt etwas oder stimmt etwas nicht? Sag es in deinen eigenen Worten: ein Link, der diesen Pin belegt, ein anderes Start- oder Enddatum und warum, oder eine Angabe, die fehlt oder falsch ist. Die KI prüft es an den Quellen dieses Pins, sucht nach besseren und ergänzt jede Seite, die dich bestätigt. Die eigenen Quellen des Pins zählen weiterhin am meisten. Auch Bilder sieht sich die KI an: Eines, das etwas anderes oder die Sache schlecht zeigt, wird nach hinten gestellt oder ersetzt.
Originaltitel: Webb: 100 MW Battery Interconnection Request S1116
Power storage100 MW · S1116: 100 MW requested battery storage. Queue status: Active. Requested date: 2027-06-01. Not current measured generation; No annual energy or battery MWh inferred. · source