Anunciada
Energy: battery storage · Verificado el 2026-10-30
Solo se destaca la etapa comunicada. Las cifras y fechas distinguen lo previsto de lo demostrado.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Towerline","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Towerline.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3298","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Este pin sigue las noticias: muestra lo que se sabe ahora, y aquí está qué cambió y qué lo provocó.
Editadopor @ThePinGang
NextEra Energy Resources development of the Towerline Clean Energy Storage Center in Tazewell County, Illinois. EncompassingJ3298 is a 200 MW / 800 MWh of utility-grade battery storage, the system interfaces with high-voltage 138 kV transmission lines near Peoria to provide rapid-response frequency stability and support regional decarbonization targets.battery storage interconnection request in Tazewell, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
NextEra Energy Resources filed zoning and transmission applications for the Towerline Clean Energy Storage Center. Provides 200 MW / 800 MWh of four-hour grid-tied battery storage in Tazewell County, Illinois. RepresentsJ3298 is a 200 MW battery storage interconnection request in Tazewell, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD clean energy capital development near the Peoria industrial center. Interconnects to 138 kV high-voltage circuits under MISO regional queue review. Supplies rapid-response capacity firming, local transmission relief, and decarbonization support. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Towerline. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Editadopor @ThePinGang
… capacity firming, local transmission relief, and decarbonization support. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Editadopor @ThePinGang
Fotos de lectores, separadas de los medios con fuentes del pin. Valora lo que comiste o viste y, en un pin de restaurante, etiqueta los platos directamente en tu foto.
La primera entrada es siempre la fuente del pin. La confianza global es una media ponderada de la firmeza con la que cada referencia respalda las horas de inicio y fin usadas arriba; una referencia cuenta la mitad por cada 180 días que sea más antigua que la más reciente.
¿Falta algo o hay un error? Dilo con tus palabras: un enlace que respalde este pin, otra fecha de inicio o fin y por qué, o un dato que falta o está mal. La IA lo contrasta con las fuentes del pin, busca otras mejores y añade cualquier página que te dé la razón. Las fuentes del propio pin siguen contando más. La IA también mira las imágenes: una que muestra otra cosa, o la muestra mal, pasa al final o se sustituye.
Título original: Towerline: 200 MW Battery Interconnection Request J3298
Power storage200 MW · J3298: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source