Energy: battery storage · Verificado el 2026-10-30
Solo se destaca la etapa comunicada. Las cifras y fechas distinguen lo previsto de lo demostrado.
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Batesville 138kV Substation","summerNetMW":250.0”
2027-09-30; requested date only, not an achieved opening.
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; Batesville 138kV Substation.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
Este pin sigue las noticias: muestra lo que se sabe ahora, y aquí está qué cambió y qué lo provocó.
Editadopor @ThePinGang
MISO regional transmission interconnection development of the Batesville Energy Storage Center in Ripley County, Indiana. SupplyingJ2581 is a 250 MW / 1,000 MWh of utility-scale battery energy storage, the facility interfaces with the Batesville 138 kV substation to provide rapid frequency response, grid inertia, and capacity firming across southeastern Indiana.battery storage interconnection request in Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date.
Batesville Energy Storage LLC submitted interconnection filings for the Batesville Energy Storage CenterJ2581 is a 250 MW battery storage interconnection request in Ripley County, Indiana. Deploys 250 MW / 1,000 MWh of utility-scale four-hour duration lithium-ion battery storage. Represents an estimated 250 million USD private clean energy infrastructure investment in southeastern Indiana. Interconnects to the Batesville 138 kV substation within the MISO transmission footprint. Provides essential rapid frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date. The point of interconnection is Batesville 138kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Editadopor @ThePinGang
… frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
Editadopor @ThePinGang
Fotos de lectores, separadas de los medios con fuentes del pin. Valora lo que comiste o viste y, en un pin de restaurante, etiqueta los platos directamente en tu foto.
La primera entrada es siempre la fuente del pin. La confianza global es una media ponderada de la firmeza con la que cada referencia respalda las horas de inicio y fin usadas arriba; una referencia cuenta la mitad por cada 180 días que sea más antigua que la más reciente.
¿Falta algo o hay un error? Dilo con tus palabras: un enlace que respalde este pin, otra fecha de inicio o fin y por qué, o un dato que falta o está mal. La IA lo contrasta con las fuentes del pin, busca otras mejores y añade cualquier página que te dé la razón. Las fuentes del propio pin siguen contando más. La IA también mira las imágenes: una que muestra otra cosa, o la muestra mal, pasa al final o se sustituye.
Título original: Batesville: 250 MW Battery Interconnection Request J2581
Power storage250 MW · J2581: 250 MW requested battery storage. Queue status: Active. Requested date: 2027-09-30. Not current measured generation; No annual energy or battery MWh inferred. · source