- Start
- Dec 15, 200990% CONFIDENCEfrom the source
The Boeing 787 Dreamliner Makes Its Maiden Flight
- Boeing conducted the 787-8 maiden flight from Paine Field in Everett on 15 December 2009 at 10:27 am PST, landing three hours later at Boeing Field.[1]
- The flight reached a top speed of 180 knots and a maximum altitude of 13,200 feet.[1]
- Boeing had planned the first flight by the end of August 2007 and premiered the aircraft, registered N787BA, at a rollout on 8 July 2007 with its major systems not yet installed.[1]
- Five announced delays followed, including incorrect fastener installation and a machinists’ strike; on 23 June 2009 the flight was postponed again for structural reasons.[1]
- Type certification came in August 2011 and the first 787-8 entered service with All Nippon Airways in October 2011.[1]
Notable features
- The 787 was the first production airliner built with a fuselage of one-piece composite barrel sections instead of fastened aluminium sheet.[1]
- Its structure is 80% composite by volume; by weight Boeing lists 50% composite, 20% aluminium, 15% titanium, 10% steel and 5% other materials.[1]
- It is powered by Rolls-Royce Trent 1000 or General Electric GEnx engines, and Boeing stated it would be about 20% more fuel-efficient than the 767.[1]
- A bleedless electrical architecture replaces bleed air with electrically powered compressors and four of six hydraulic power sources with electric pumps; Boeing says it extracts 35% less power from the engines.[1]
- The cabin windows measure 10.7 by 18.4 in (27 by 47 cm) and use electrochromic smart glass with five levels of dimming instead of plastic shades; the aircraft cruises at Mach 0.85.[1]
References 282% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]90%en.wikipedia.org/wiki/Boeing_787_Dreamlineren.wikipedia.org· Posted Sep 21, 2026· Starts Dec 15, 2009 ✓· 50% of score
Happened as dated, per en.wikipedia.org: "On December 15, 2009, Boeing conducted the 787-8 maiden flight from Paine Field in Everett, Washington, at 10:27 am PST."
- [2]75%12 Years Ago the Boeing 787 Dreamliner made its debutaerotime.aero· Added Sep 21, 2026· 50% of score
Confirms the 15 December 2009 three-hour first flight and names the crew, 787 chief pilot Mike Carriker and Captain Randy Neville, whom the source[1] article does not.
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.