- Start
- Feb 20, 200890% CONFIDENCEfrom the source
Madrid–Barcelona High-Speed Line Opens, Completing Spain's Flagship AVE Corridor
- The Madrid-Barcelona high-speed line (621 km, Adif-owned, 25 kV double track) was inaugurated in full on 20 February 2008, cutting the trip to 2 h 30 from over six hours[3]
- The first phase Madrid-Zaragoza-Lleida opened commercially on 11 October 2003 at 200 km/h; speeds rose to 300 km/h from 7 May 2007[3]
- It is designed for 350 km/h but operates at 300 km/h; ridership was 4.4 million in 2019[3]
- By end of 2017 it took 63% of traffic, mostly from aircraft; it was extended to Figueres-Vilafant on 9 January 2013 linking to the French TGV network[3]
References 380% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]90%youtube.com/watch?v=rYEp-HXFtE4youtube.com· Posted Sep 15, 2026· Starts Feb 20, 2008 ✓· 33% of score
Wikipedia's[3] Madrid–Barcelona high-speed rail line article gives 20 February 2008 as the date the complete line opened, after the Madrid–Zaragoza–Lleida section opened in October 2003.
- [2]65%Spain moves to 350km/h on Madrid-Barcelona line - International Railway Journalrailjournal.com· Added Sep 15, 2026· 33% of score
Describes Adif's AV350 programme to raise the Madrid-Barcelona line's operating speed toward its original 350km/h design, with major construction starting in 2026.[1]
- [3]85%Madrid–Barcelona high-speed rail line - Wikipediaen.wikipedia.org· Added Sep 15, 2026· 33% of score
States the complete Madrid–Barcelona high-speed line opened on 20 February 2008, following the October 2003 opening of the Madrid–Zaragoza–Lleida section.[1]
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.