Annoncée
Energy: battery storage · Vérifié le 2026-10-30
Seule l’étape rapportée est mise en évidence. Les chiffres et dates distinguent les projets des faits démontrés.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hamilton","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hamilton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Ce pin suit l'actualité : il montre ce que l'on sait maintenant, et voici ce qui a changé et pourquoi.
Modifiépar @ThePinGang
Broad Reach Power development of the Hamilton Clean Energy Storage Facility in Hamilton County, Illinois. TheJ3296 is a 200 MW / 800 MWh grid-scale energy storage project provides critical capacity, frequency response, and local peak load shaving across the Ameren Illinois service territory within the MISO wholesale electricity market.battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
Broad Reach Power advanced engineering and county development reviews for the Hamilton Clean Energy Storage Facility. Features a 200 MW / 800 MWh four-hour utility-scale battery energy storage system. RepresentsJ3296 is a 200 MW battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD capital project supporting grid reliability in southern Illinois. Connects to Ameren Illinois transmission lines serving the wholesale MISO electricity market. Delivers fast-ramping frequency response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hamilton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Modifiépar @ThePinGang
… response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Modifiépar @ThePinGang
Photos de lecteurs, distinctes des médias sourcés du pin. Notez ce que vous avez mangé ou vu et, sur un pin de restaurant, identifiez les plats directement sur votre photo.
La première entrée est toujours la source de l’épingle. La confiance globale est une moyenne pondérée de la fermeté avec laquelle chaque référence étaye les heures de début et de fin retenues ci-dessus ; une référence compte moitié moins pour chaque tranche de 180 jours d’ancienneté par rapport à la plus récente.
Il manque quelque chose ou une erreur s'est glissée ? Dites-le avec vos mots : un lien qui étaye cette épingle, une autre date de début ou de fin et pourquoi, ou une information absente ou erronée. L'IA la vérifie au regard des sources de l'épingle, en cherche de meilleures et ajoute toute page qui vous donne raison. Les sources de l'épingle restent celles qui comptent le plus. L'IA regarde aussi les images : une image qui montre autre chose, ou qui le montre mal, passe en dernier ou est remplacée.
Titre original: Hamilton: 200 MW Battery Interconnection Request J3296
Power storage200 MW · J3296: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source