Annoncée
Energy: battery storage · Vérifié le 2026-10-30
Seule l’étape rapportée est mise en évidence. Les chiffres et dates distinguent les projets des faits démontrés.
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Batesville 138kV Substation","summerNetMW":250.0”
2027-09-30; requested date only, not an achieved opening.
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; Batesville 138kV Substation.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
Ce pin suit l'actualité : il montre ce que l'on sait maintenant, et voici ce qui a changé et pourquoi.
Modifiépar @ThePinGang
MISO regional transmission interconnection development of the Batesville Energy Storage Center in Ripley County, Indiana. SupplyingJ2581 is a 250 MW / 1,000 MWh of utility-scale battery energy storage, the facility interfaces with the Batesville 138 kV substation to provide rapid frequency response, grid inertia, and capacity firming across southeastern Indiana.battery storage interconnection request in Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date.
Batesville Energy Storage LLC submitted interconnection filings for the Batesville Energy Storage CenterJ2581 is a 250 MW battery storage interconnection request in Ripley County, Indiana. Deploys 250 MW / 1,000 MWh of utility-scale four-hour duration lithium-ion battery storage. Represents an estimated 250 million USD private clean energy infrastructure investment in southeastern Indiana. Interconnects to the Batesville 138 kV substation within the MISO transmission footprint. Provides essential rapid frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date. The point of interconnection is Batesville 138kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Modifiépar @ThePinGang
… frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
Modifiépar @ThePinGang
Photos de lecteurs, distinctes des médias sourcés du pin. Notez ce que vous avez mangé ou vu et, sur un pin de restaurant, identifiez les plats directement sur votre photo.
La première entrée est toujours la source de l’épingle. La confiance globale est une moyenne pondérée de la fermeté avec laquelle chaque référence étaye les heures de début et de fin retenues ci-dessus ; une référence compte moitié moins pour chaque tranche de 180 jours d’ancienneté par rapport à la plus récente.
Il manque quelque chose ou une erreur s'est glissée ? Dites-le avec vos mots : un lien qui étaye cette épingle, une autre date de début ou de fin et pourquoi, ou une information absente ou erronée. L'IA la vérifie au regard des sources de l'épingle, en cherche de meilleures et ajoute toute page qui vous donne raison. Les sources de l'épingle restent celles qui comptent le plus. L'IA regarde aussi les images : une image qui montre autre chose, ou qui le montre mal, passe en dernier ou est remplacée.
Titre original: Batesville: 250 MW Battery Interconnection Request J2581
Power storage250 MW · J2581: 250 MW requested battery storage. Queue status: Active. Requested date: 2027-09-30. Not current measured generation; No annual energy or battery MWh inferred. · source