Cablebús Line 4 Finished Between Tlalpan and Coyoacán
ESTIMATED50% CONFIDENCEThe presidency's release says "se espera que en diciembre de 2027 esté concluida" (it is expected to be finished in December 2027), a month rather than a fixed day.[1]
The 11.4-kilometre cable car will run nine stations from Pedregal de San Nicolás in the Ajusco down to Metro Universidad, carrying an investment the presidency puts at "más de 4 mil 700 millones de pesos" (more than 4.7 billion pesos). Construction stood at 20 per cent when President Sheinbaum inspected the works in August 2026.
MX$4.7B
1.00