B&W Wins Engineering Study for Alberta Air-Storage and Hydrogen Hub
CONFIRMÉCONFIANCE 85 %Stated as done, per B&W's release "(AKRON, Ohio – October 28, 2025)": "announced today that it has been awarded a contract by Cache Power Corp. (Cache Power) to execute an engineering study"; no time of day was found.[1]
Cache Power hired Babcock & Wilcox to engineer its BrightLoop hydrogen technology, up to 60 tonnes a day with the CO2 captured, into the 640 MW Marguerite Lake compressed-air energy storage plant near La Corey, Alberta. An Alberta Innovates grant pays for part of the study.
C$4.3M
1.00