घोषित
Energy: battery storage · जाँच 2026-10-30
केवल रिपोर्ट किए गए चरण को दिखाया गया है। आँकड़ों और तारीखों में योजना और प्रमाणित स्थिति अलग रखी गई है।
205 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hazleton","summerNetMW":205.0”
2028-06-30; requested date only, not an achieved opening.
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hazleton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00"”
यह पिन न्यूज़ को फॉलो करता है: यह अभी जो पता है वह दिखाता है, और यहां बताया गया है कि क्या बदला और इसकी वजह क्या रही।
संपादित@ThePinGang द्वारा
Alliant Energy / Interstate Power and Light development of the Hazleton Clean Energy Storage Center in Buchanan County, Iowa. TheJ3780 is a 205 MW / 820 MWh battery facility connects to the 345 kV Hazleton substation hub, providing essential grid flexibility, wind generation firming, and local transmission support across northeastern Iowa.battery storage interconnection request in Buchanan, IA. The grid operator lists its queue status as Active. The requested in-service date is 2028-06-30; this is a planning date.
Alliant Energy / Interstate Power and Light advanced engineering reviews for the Hazleton Clean Energy Storage Center. Features 205 MW / 820 MWh of grid-scale battery storage capacity in Buchanan County, Iowa. RepresentsJ3780 is a 205 MW battery storage interconnection request in Buchanan, IA. The grid operator lists its queue status as Active. The requested in-service date is 2028-06-30; this is a 220 million USD private clean energy infrastructure investment in eastern Iowa. Connects to the 345 kV Hazleton substation hub within the MISO transmission footprint. Enhances grid flexibility, firms regional wind generation, and reinforces transmission reliability. Timeline: planned project targeting commercial operation in June 2028 (estimated) under MISO interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hazleton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
संपादित@ThePinGang द्वारा
… firms regional wind generation, and reinforces transmission reliability. Timeline: planned project targeting commercial operation in June 2028 (estimated) under MISO interconnection queue and state regulatory schedules.
संपादित@ThePinGang द्वारा
पाठकों की फ़ोटो, पिन के स्रोत-आधारित मीडिया से अलग। जो आपने खाया या देखा उसे रेट करें, और रेस्तराँ पिन पर अपनी फ़ोटो पर ही डिश टैग करें।
पहली एंट्री हमेशा पिन का सोर्स होती है। कुल कॉन्फ़िडेंस एक भारित औसत है कि हर संदर्भ ऊपर इस्तेमाल किए गए शुरू और खत्म होने के समय का कितनी मज़बूती से समर्थन करता है; सबसे नए संदर्भ से हर 180 दिन पुराना होने पर किसी संदर्भ की गिनती आधी हो जाती है।
कुछ छूट गया या गलत है? अपने शब्दों में बताएं: कोई लिंक जो इस पिन का समर्थन करता हो, कोई अलग शुरुआत या खत्म होने की तारीख और उसकी वजह, या कोई तथ्य जो छूट गया हो या गलत हो। AI इसे इस पिन के सोर्स से मिलाकर जांचता है, बेहतर सोर्स खोजता है, और जो भी पेज आपकी बात का समर्थन करता है उसे जोड़ देता है। पिन के अपने सोर्स की अहमियत फिर भी सबसे ज़्यादा रहती है। AI तस्वीरें भी देखता है: जो तस्वीर कुछ और दिखाती हो या ठीक से न दिखाती हो, उसे नीचे कर दिया जाता है या बदल दिया जाता है।
मूल शीर्षक: Hazleton: 205 MW Battery Interconnection Request J3780
Power storage205 MW · J3780: 205 MW requested battery storage. Queue status: Active. Requested date: 2028-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source