Energy: battery storage · जाँच 2026-10-30
केवल रिपोर्ट किए गए चरण को दिखाया गया है। आँकड़ों और तारीखों में योजना और प्रमाणित स्थिति अलग रखी गई है।
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Batesville 138kV Substation","summerNetMW":250.0”
2027-09-30; requested date only, not an achieved opening.
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; Batesville 138kV Substation.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2581","queueDate":"2022-09-15T04:00:00+00:00","inService":"2027-09-30T04:00:00+00:00"”
यह पिन न्यूज़ को फॉलो करता है: यह अभी जो पता है वह दिखाता है, और यहां बताया गया है कि क्या बदला और इसकी वजह क्या रही।
संपादित@ThePinGang द्वारा
MISO regional transmission interconnection development of the Batesville Energy Storage Center in Ripley County, Indiana. SupplyingJ2581 is a 250 MW / 1,000 MWh of utility-scale battery energy storage, the facility interfaces with the Batesville 138 kV substation to provide rapid frequency response, grid inertia, and capacity firming across southeastern Indiana.battery storage interconnection request in Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date.
Batesville Energy Storage LLC submitted interconnection filings for the Batesville Energy Storage CenterJ2581 is a 250 MW battery storage interconnection request in Ripley County, Indiana. Deploys 250 MW / 1,000 MWh of utility-scale four-hour duration lithium-ion battery storage. Represents an estimated 250 million USD private clean energy infrastructure investment in southeastern Indiana. Interconnects to the Batesville 138 kV substation within the MISO transmission footprint. Provides essential rapid frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Ripley, IN. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-30; this is a planning date. The point of interconnection is Batesville 138kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
संपादित@ThePinGang द्वारा
… frequency regulation, system inertia, and regional capacity firming. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
संपादित@ThePinGang द्वारा
पाठकों की फ़ोटो, पिन के स्रोत-आधारित मीडिया से अलग। जो आपने खाया या देखा उसे रेट करें, और रेस्तराँ पिन पर अपनी फ़ोटो पर ही डिश टैग करें।
पहली एंट्री हमेशा पिन का सोर्स होती है। कुल कॉन्फ़िडेंस एक भारित औसत है कि हर संदर्भ ऊपर इस्तेमाल किए गए शुरू और खत्म होने के समय का कितनी मज़बूती से समर्थन करता है; सबसे नए संदर्भ से हर 180 दिन पुराना होने पर किसी संदर्भ की गिनती आधी हो जाती है।
कुछ छूट गया या गलत है? अपने शब्दों में बताएं: कोई लिंक जो इस पिन का समर्थन करता हो, कोई अलग शुरुआत या खत्म होने की तारीख और उसकी वजह, या कोई तथ्य जो छूट गया हो या गलत हो। AI इसे इस पिन के सोर्स से मिलाकर जांचता है, बेहतर सोर्स खोजता है, और जो भी पेज आपकी बात का समर्थन करता है उसे जोड़ देता है। पिन के अपने सोर्स की अहमियत फिर भी सबसे ज़्यादा रहती है। AI तस्वीरें भी देखता है: जो तस्वीर कुछ और दिखाती हो या ठीक से न दिखाती हो, उसे नीचे कर दिया जाता है या बदल दिया जाता है।
मूल शीर्षक: Batesville: 250 MW Battery Interconnection Request J2581
Power storage250 MW · J2581: 250 MW requested battery storage. Queue status: Active. Requested date: 2027-09-30. Not current measured generation; No annual energy or battery MWh inferred. · source