Energy: battery storage · Diperiksa 2026-10-30
Hanya tahap yang dilaporkan yang disorot. Angka dan tanggal membedakan rencana dari hasil terbukti.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hamilton","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hamilton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Pin ini mengikuti berita: pin ini menampilkan apa yang diketahui saat ini, dan di sini ada apa yang berubah serta penyebabnya.
Dieditoleh @ThePinGang
Broad Reach Power development of the Hamilton Clean Energy Storage Facility in Hamilton County, Illinois. TheJ3296 is a 200 MW / 800 MWh grid-scale energy storage project provides critical capacity, frequency response, and local peak load shaving across the Ameren Illinois service territory within the MISO wholesale electricity market.battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
Broad Reach Power advanced engineering and county development reviews for the Hamilton Clean Energy Storage Facility. Features a 200 MW / 800 MWh four-hour utility-scale battery energy storage system. RepresentsJ3296 is a 200 MW battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD capital project supporting grid reliability in southern Illinois. Connects to Ameren Illinois transmission lines serving the wholesale MISO electricity market. Delivers fast-ramping frequency response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hamilton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Dieditoleh @ThePinGang
… response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Dieditoleh @ThePinGang
Foto dari pembaca, terpisah dari media bersumber milik pin. Nilai apa yang Anda makan atau lihat, dan di pin restoran, tandai hidangan langsung pada foto Anda.
Entri pertama selalu merupakan sumber pin. Keyakinan keseluruhan adalah rata-rata tertimbang dari seberapa kuat setiap referensi mendukung waktu mulai dan berakhir yang digunakan di atas; bobot sebuah referensi berkurang setengahnya untuk setiap 180 hari lebih lama dari yang terbaru.
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
Judul asli: Hamilton: 200 MW Battery Interconnection Request J3296
Power storage200 MW · J3296: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source