Construction research 2026-10-24: Epoch’s[1] 2026-05-18 observation documents remaining physical construction/installation for this named buildout. In Progress does not complete earlier operating buildings or future capacity. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “generators/cooling equipment being installed” Dated observation 2026-05-18; future trajectory rows and modeled costs are distinguished from this physical milestone.
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
| 2027-07-01 | Tanggal operasional yang diharapkan untuk sisa gedung yang dilacak (11, dan 1-4) di tiga kampus. Perkiraan ini didasarkan pada bangunan sebelumnya yang membutuhkan waktu sekitar 1,5 tahun dari rangka… |
|---|
Catatan citra satelit Epoch AI, dalam urutan tanggal. · sumber
Physical-stage observation dated 2026-05-18. Campus buildout remains under construction; already operating buildings do not complete the remaining work. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“generators/cooling equipment being installed”
Epoch’s dated 2026-05-18 assessment: generators/cooling equipment being installed Campus buildout remains under construction; already operating buildings do not complete the remaining work.
“generators/cooling equipment being installed”
Epoch estimates AI hardware: Amazon Trainium2, Nvidia H100, Nvidia H200, and Nvidia B200 chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Amazon Trainium2, Nvidia H100, Nvidia H200, and Nvidia B200 chips.”
Epoch dated observation: Land clearing begins for Buildings 5-9 (eastern campus).
“Land clearing begins for Buildings 5-9 (eastern campus).”
Epoch assessment: Satellite imagery shows Building 1 in the northern campus still appears…
“Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter.”
Judul asli: AWS New Albany AI Data Center Buildout
Observasi Epoch tahun 2026-05-18 mendokumentasikan sisa konstruksi/instalasi fisik untuk pembangunan yang disebutkan ini. Dalam Proses tidak menyelesaikan bangunan yang beroperasi sebelumnya atau kapasitas di masa depan. Jumlah daya dan akselerator tetap merupakan perkiraan Epoch, bukan peringkat yang disertifikasi oleh operator. Biaya modal dolar 2025 yang dimodelkan mencakup perangkat keras komputasi dan bukan merupakan anggaran konstruksi asli sumber.
Pelatihan AI perbatasan hiperskala dan kampus inferensi yang dilacak oleh Epoch AI dengan jejak satelit beranotasi (31 bagian fisik).