Entri pertama selalu merupakan sumber pin. Keyakinan keseluruhan adalah rata-rata tertimbang dari seberapa kuat setiap referensi mendukung waktu mulai dan berakhir yang digunakan di atas; bobot sebuah referensi berkurang setengahnya untuk setiap 180 hari lebih lama dari yang terbaru.
Hoodline[5] melaporkan postingan sosial kontraktor yang menunjuk pada peletakan batu pertama pada 19 November 2025; pengembang belum mempublikasikan tanggal mulai resmi, dan belum ada tanggal penyelesaian yang diposting.
Regional per-unit cost benchmark ($420k-$615k, vertical hard cost) behind the pin's estimated price; not specific to this project.[1]
Summary states Zephyr is building 223 apartments with delivery slated for early 2028 (article published 2026-08-03).[1]
Project directory page carrying Zephyr's rendering used as the lead image.[1]
AI-assisted article; source for the 1.74-acre parcel, 239,887 sq ft, 2025 mobilization and the November 19, 2025 groundbreaking inferred from contractor posts.[1]
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
Benchmark for California (Los Angeles, Bay Area, San Diego) wood-frame podium projects.
“California (LA, Bay, San Diego) $420k–$615k/unit Highest US wood-frame cost.”
Top of the same published range.
“California (LA, Bay, San Diego) $420k–$615k/unit Highest US wood-frame cost.”
Low: 223 × $420,000 = $93,660,000. High: 223 × $615,000 = $137,145,000.
223 × $517,500 (midpoint per unit) = $115,402,500, the midpoint ($115,402,500) rounded to $115 million.
The price divided by the 239,887 sq ft of gross building area in the city filing, as a reasonableness check on the per-unit range.
Land, design and permit fees, financing and the developer fee. The only published figure, the roughly $9 million land purchase in 2024, is not construction cost. This is an estimate of vertical building cost, not a published budget.
About 239,887 sq ft
“roughly 239,887 square feet of gross building area”
Roughly 1.75 acres at 4620 Pacific Highway, Old Town
“The development spans roughly 1.75 acres at 4620 Pacific Highway”
223 units in a seven-story building, 33 of them affordable (20 very-low-income, 13 moderate-income)
“City filings keep the count at 33 set-aside affordable units, with 20 reserved for very-low-income households and 13 for moderate-income households.”
November 19, 2025, per contractor social posts (no official date published)
“contractor social posts pointed to a November 19, 2025 ground-breaking”
Under construction; no final completion date posted
“With construction underway and no final completion date posted”
“contractor social posts pointed to a November 19, 2025 ground-breaking”
Estimated completion (delivery)
“Zephyr is building 223 apartments on the former Perry's Cafe site in San Diego's Old Town, with delivery slated for early 2028.”
Judul asli: Perry's Café Redevelopment Project
Tidak ada anggaran konstruksi yang dipublikasikan, jadi harga pin merupakan perkiraan yang dibuat dari bagian-bagian berikut:
Gambar utama adalah rendering proyek Zephyr yang diterbitkan oleh BuildSD.
[4]