Produksi komersial
Housing: residential construction · Diperiksa 2026-10-29
Hanya tahap yang dilaporkan yang disorot. Angka dan tanggal membedakan rencana dari hasil terbukti.
62 apartments across the adaptive-reuse building, addition and townhomes.
“neighborhood of 62 apartments”
Early 2025; the annual report explicitly identifies calendar year 2025.
“was completed early”
52 apartments in the renovated former bank building and addition, plus 10 townhomes in two buildings.
“52 apartments within the renovated building and new addition, along with 10 townhomes”
Development completed
“The 62 -unit Phare development by Pennrose”
Pennrose bought the former bank headquarters site
“Pennrose bought the bank’s old headquarters on Jan. 4, 2024 for $3,250,000”
Affordable-unit lottery opened
“Applications are now open for a new affordable housing development”
Foto dari pembaca, terpisah dari media bersumber milik pin. Nilai apa yang Anda makan atau lihat, dan di pin restoran, tandai hidangan langsung pada foto Anda.
Entri pertama selalu merupakan sumber pin. Keyakinan keseluruhan adalah rata-rata tertimbang dari seberapa kuat setiap referensi mendukung waktu mulai dan berakhir yang digunakan di atas; bobot sebuah referensi berkurang setengahnya untuk setiap 180 hari lebih lama dari yang terbaru.
Perkiraan batas waktu: Dibuka pada tahun 2025, menurut laporan tahunan kota. Tanggal mewakili akhir periode publikasi, bukan hari pasti yang diumumkan; penyelesaian dan perpindahan tetap berbeda.
Construction research 2026-10-24: Orleans Affordable Housing Trust’s December 2025 materials describe Pennrose’s[1] exact 62-home Phare development as now complete and leasing and give US$37 million total cost. The Independent’s February 2025 article explicitly corrects its earlier US$71.6 million figure to US$37 million. Native cost follows the corrected total, not the land purchase or CPA contribution. The existing estimated year-end anchor is retained; no exact opening day is invented. Source quote: “now complete and leasing.” Page 13 (zero-based), November 18 application concerning completed 62-home Phare; same page states $37M total cost.
Project-specific operator, government or project-partner source reviewed on October 9, 2026.[1]
Project-specific operator, government or project-partner source reviewed on October 9, 2026.[1]
Construction research 2026-10-24: Orleans Affordable Housing Trust’s December 2025 materials describe Pennrose’s[1] exact 62-home Phare development as now complete and leasing and give US$37 million total cost. The Independent’s February 2025 article explicitly corrects its earlier US$71.6 million figure to US$37 million. Native cost follows the corrected total, not the land purchase or CPA contribution. The existing estimated year-end anchor is retained; no exact opening day is invented. Source quote: “The total price tag for Phare’s construction was $37 million”
Ada yang kurang atau salah? Sampaikan dengan kata-kata Anda sendiri: tautan yang mendukung pin ini, tanggal mulai atau berakhir yang berbeda beserta alasannya, atau fakta yang kurang atau keliru. AI memeriksanya terhadap sumber pin ini, mencari sumber yang lebih baik, dan menambahkan halaman mana pun yang mendukung Anda. Sumber pin itu sendiri tetap paling diperhitungkan. Gambar yang menampilkan hal lain, atau menampilkannya dengan buruk, juga diperiksa, lalu diturunkan atau diganti.
Judul asli: Phare — Orleans affordable housing
Materi Orleans Affordable Housing Trust pada bulan Desember 2025 menggambarkan pengembangan Phare 62 rumah milik Pennrose yang sekarang telah selesai dan disewakan serta memberikan total biaya US$37 juta. Artikel The Independent pada bulan Februari 2025 secara eksplisit mengoreksi angka sebelumnya sebesar US$71,6 juta menjadi US$37 juta. Biaya asli mengikuti total yang dikoreksi, bukan pembelian tanah atau kontribusi CPA. Perkiraan jangkar akhir tahun yang ada dipertahankan; tidak ada hari pembukaan pasti yang ditemukan.
Dibuka pada tahun 2025, menurut laporan tahunan kota. Perkiraan batas waktu: Dibuka pada tahun 2025, menurut laporan tahunan kota. Tanggal mewakili akhir periode publikasi, bukan hari pasti yang diumumkan; penyelesaian dan perpindahan tetap berbeda.
Tanyakan kepada operator tentang lowongan saat ini, tingkat pendapatan yang berlaku, dan persyaratan lamaran. Sewa yang dipublikasikan bervariasi di seluruh proyek dan bukan merupakan kutipan unit individu. Warga membayar listrik dan kabel secara terpisah.[1]
Sewa kamar tidur yang diterbitkan operator ditinjau pada 9 Oktober 2026. Beberapa properti berisi beberapa program pendapatan; listingan tidak menetapkan setiap harga ke suatu tingkatan.[1]
| Apartemen / kondisi | Sewa bulanan |
|---|---|
| 1 kamar tidur | $1,402–$1,915 |
| 2 kamar tidur | $1,670–$2,286 |
| 3 kamar tidur | $1,877–$2,588 |
Konfirmasikan apartemen terbatas, kualifikasi pendapatan, ketersediaan saat ini, utilitas, biaya dan penawaran akhir dengan sewa. Angka yang dipublikasikan mungkin berbeda dari kontribusi penyewa yang disubsidi.