Annunciata
Energy: photovoltaic generation · Verificato il 2026-10-30
È evidenziata solo la fase riportata. Cifre e date distinguono i piani dai risultati dimostrati.
150 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Fayetteville Bee Hollow Road 138 kV Substation","summerNetMW":150.0”
2025-06-30; requested date only, not an achieved opening.
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Fayetteville Bee Hollow Road 138 kV Substation.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Questo pin segue le notizie: mostra ciò che si sa ora, e qui trovi cosa è cambiato e da dove.
Modificatodi @ThePinGang
MISO regional transmission interconnection development of the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Providing 150 MWac of renewable power, the utility-scale solar project feeds into Ameren Illinois transmission lines to power metro-east Illinois communities with clean, locally generated electricity.IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date.
Invenergy progressed development filings for the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Generates 150 MWac of clean photovoltaic power across the metro-east St. Louis region. Represents an estimated 170 million USD renewable infrastructure investment. Connects to Ameren Illinois transmission lines along the State Route 15 corridor. Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date. The point of interconnection is Fayetteville Bee Hollow Road 138 kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Modificatodi @ThePinGang
… Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.
Foto dei lettori, separate dai media con fonti del pin. Valuta ciò che hai mangiato o visto e, su un pin di ristorante, tagga i piatti direttamente sulla tua foto.
La prima voce è sempre la fonte del pin. L’affidabilità complessiva è una media ponderata di quanto ogni fonte conferma gli orari di inizio e fine indicati sopra; una fonte conta la metà per ogni 180 giorni in più rispetto alla più recente.
Manca qualcosa o c’è un errore? Dillo con parole tue: un link che conferma questo pin, una data di inizio o fine diversa e perché, o un fatto che manca o è sbagliato. L’IA lo confronta con le fonti del pin, ne cerca di migliori e aggiunge qualsiasi pagina ti dia ragione. Le fonti del pin contano comunque di più. Anche un’immagine che mostra altro, o lo mostra male, viene esaminata e spostata in basso o sostituita.
Titolo originale: Bee Hollow: 150 MW Solar Interconnection Request J1311
Power generation150 MW · J1311: 150 MW requested photovoltaic generation. Queue status: Done. Requested date: 2025-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source