In costruzione
Energy: natural-gas generation · Verificato il 2026-10-29
È evidenziata solo la fase riportata. Cifre e date distinguono i piani dai risultati dimostrati.
USD 1.6 billion Legend station investment; economic impact is a separate figure.
“$1.6 billion investment”
Expected in service mid-2028.
Operator reports groundbreaking on Legend and Lone Star.
“break ground on Legend and Lone Star power stations”
Natural-gas plant at Port Arthur; combined two-plant MW not allocated to this station.
In-service target
Questo pin segue le notizie: mostra ciò che si sa ora, e qui trovi cosa è cambiato e da dove.
Modificatodi @ThePinGang
Prima
2028. Entergy’s April 2026 groundbreaking release identifies Legend and Lone Star as physically progressing projects expected to begin serving customers in 2028.
Construction is verified; the completion date remains an estimate. The timeline marker represents the published target year/month, not a confirmed opening day.
Entergy’s September 11, 2025 approval release gives a $1.6 billion investment for Legend, updating the earlier $1.46 billion proposal. The operator’s design rating is 754 MW and physical groundbreaking occurred April 9, 2026. Economic-impact and customer-benefit figures are not the construction budget.
Published project-specific cost for Legend Power Station: USD 1.6e+09. Basis: Published project-specific capital/construction estimate.
Published electric generating project rating for Legend Power Station: 754 MW. Basis: Operator-reported electric generating capacity; not annual energy production. The operator identifies Legend as a 754 MW combined-cycle plant.
Entergy’s April 9, 2026 announcement confirms groundbreaking on Legend in Port Arthur and Lone Star near Cleveland. Both were approved by the PUCT in 2025 and are expected to serve customers in 2028. The combined projects exceed 1,200 MW; that combined figure is not the capacity of either plant alone. April 9, 2026 groundbreaking verifies physical construction; target service is 2028.
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Joint groundbreaking ceremony for Legend and Lone Star power stations in Port Arthur, Texas, April 9, 2026. This is the shared project ceremony, not a photograph of a completed Lone Star plant or its Cleveland-area construction site. Credit: Office of the Texas Governor, via Entergy Texas. Source and gallery; original media.
Modificatodi @ThePinGang
Prima
2028. Entergy’s April 2026 groundbreaking release identifies Legend and Lone Star as physically progressing projects expected to begin serving customers in 2028.
Construction is verified; the completion date remains an estimate. The timeline marker represents the published target year/month, not a confirmed opening day.
Entergy’s September 11, 2025 approval release gives a $1.6 billion investment for Legend, updating the earlier $1.46 billion proposal. The operator’s design rating is 754 MW and physical groundbreaking occurred April 9, 2026. Economic-impact and customer-benefit figures are not the construction budget.
Published project-specific cost for Legend Power Station: USD 1.6e+09. Basis: Published project-specific capital/construction estimate.
Published electric generating project rating for Legend Power Station: 754 MW. Basis: Operator-reported electric generating capacity; not annual energy production. The operator identifies Legend as a 754 MW combined-cycle plant.
Entergy’s April 9, 2026 announcement confirms groundbreaking on Legend in Port Arthur and Lone Star near Cleveland. Both were approved by the PUCT in 2025 and are expected to serve customers in 2028. The combined projects exceed 1,200 MW; that combined figure is not the capacity of either plant alone. April 9, 2026 groundbreaking verifies physical construction; target service is 2028.
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Modificatodi @ThePinGang
Modificatodi @ThePinGang
Prima
Prima
Entergy’s September 11, 2025 approval release gives a $1.6 billion investment for Legend, updating the earlier $1.46 billion proposal. The operator’s design rating is 754 MW and physical groundbreaking occurred April 9, 2026. Economic-impact and customer-benefit figures are not the construction budget.
Published project-specific cost for Legend Power Station: USD 1.6e+09. Basis: Published project-specific capital/construction estimate.
Published electric generating project rating for Legend Power Station: 754 MW. Basis: Operator-reported electric generating capacity; not annual energy production. The operator identifies Legend as a 754 MW combined-cycle plant.
Entergy’s April 9, 2026 announcement confirms groundbreaking on Legend in Port Arthur and Lone Star near Cleveland. Both were approved by the PUCT in 2025 and are expected to serve customers in 2028. The combined projects exceed 1,200 MW; that combined figure is not the capacity of either plant alone. April 9, 2026 groundbreaking verifies physical construction; target service is 2028.
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Modificatodi @ThePinGang
Prima
Prima
Entergy’s April 9, 2026 announcement confirms groundbreaking on Legend in Port Arthur and Lone Star near Cleveland. Both were approved by the PUCT in 2025 and are expected to serve customers in 2028. The combined projects exceed 1,200 MW; that combined figure is not the capacity of either plant alone.
EIA August 2026 generator inventory, plant ID 68053: Legend Power Station, Jefferson County, TX. Included 1 new/recent generating units with a summed nameplate rating of 754 MW.
EIA reports operation at month/year precision. The date is the last day of the earliest reported operation month/year, an estimated display boundary, not an exact opening day. Different units may have later dates. Future dates are operator-reported plans, not guarantees.
Coordinates are the EIA-reported plant point, not a verified entrance. New units at existing plants are included; the total excludes older units and battery/pumped storage. Capacity is a power rating, not annual energy output. Status was reported in August and may have changed since.
Foto dei lettori, separate dai media con fonti del pin. Valuta ciò che hai mangiato o visto e, su un pin di ristorante, tagga i piatti direttamente sulla tua foto.
La prima voce è sempre la fonte del pin. L’affidabilità complessiva è una media ponderata di quanto ogni fonte conferma gli orari di inizio e fine indicati sopra; una fonte conta la metà per ogni 180 giorni in più rispetto alla più recente.
Obiettivo pubblicato: 2028. La costruzione è documentata, ma questa tappa futura di completamento/entrata in esercizio è una stima. La data è un indicatore di fine anno/mese sulla linea temporale e non un giorno di apertura esatto confermato. Fonte: https://www.entergy[3][4][5].com/news/entergy-texas-breaks-ground-legend-and-lone-star
Legend Power Station design rendering from the upper panel of Entergy[3][4][5] Texas’s February 4, 2026 presentation, PDF page 10. This is the Legend panel, not the Lone Star design below it, and is not an as-built photograph.
Published project-specific cost for Legend Power Station: USD 1.6e+09. Basis: Published project-specific capital/construction estimate.[1]
Published electric generating project rating for Legend Power Station: 754 MW. Basis: Operator-reported electric generating capacity; not annual energy production. The operator identifies Legend as a 754 MW combined-cycle plant.[1]
Entergy’s[3][4] April 9, 2026 announcement confirms groundbreaking on Legend in Port Arthur and Lone Star near Cleveland. Both were approved by the PUCT in 2025 and are expected to serve customers in 2028. The combined projects exceed 1,200 MW; that combined figure is not the capacity of either plant alone. April 9, 2026 groundbreaking verifies physical construction; target service is 2028.
Manca qualcosa o c’è un errore? Dillo con parole tue: un link che conferma questo pin, una data di inizio o fine diversa e perché, o un fatto che manca o è sbagliato. L’IA lo confronta con le fonti del pin, ne cerca di migliori e aggiunge qualsiasi pagina ti dia ragione. Le fonti del pin contano comunque di più. Anche un’immagine che mostra altro, o lo mostra male, viene esaminata e spostata in basso o sostituita.
Titolo originale: Legend Power Station — estimated target 2028
2028. Il comunicato di Entergy dell’aprile 2026 sull’avvio dei lavori indica Legend e Lone Star come progetti in avanzamento fisico, che dovrebbero iniziare a servire i clienti nel 2028.[5]
La costruzione è verificata; la data di completamento resta una stima. L’indicatore sulla cronologia rappresenta l’anno/mese obiettivo pubblicato, non un giorno di apertura confermato.
Il comunicato di approvazione di Entergy dell’11 settembre 2025 indica un investimento di 1.6 miliardi di dollari per Legend, aggiornando la precedente proposta di 1.46 miliardi. La potenza di progetto dell’operatore è di 754 MW e l’avvio fisico dei lavori è avvenuto il 9 aprile 2026. Le cifre sull’impatto economico e sui benefici per i clienti non corrispondono al budget di costruzione.[3][4][5]
Costo pubblicato del progetto Legend Power Station: USD 1.6e+09. Base: stima pubblicata di capitale/costruzione specifica del progetto.[3]
Potenza di generazione elettrica pubblicata per Legend Power Station: 754 MW. Base: capacità di generazione elettrica comunicata dall’operatore; non è produzione annua di energia. L’operatore descrive Legend come una centrale a ciclo combinato da 754 MW.[4]
L’annuncio di Entergy del 9 aprile 2026 conferma l’avvio dei lavori di Legend a Port Arthur e di Lone Star vicino a Cleveland. Entrambi sono stati approvati dalla PUCT nel 2025 e dovrebbero servire i clienti nel 2028. I progetti combinati superano 1,200 MW; questa cifra complessiva non è la capacità di nessuna delle due centrali da sola. L’avvio dei lavori del 9 aprile 2026 verifica la costruzione fisica; il servizio previsto è nel 2028.[5]
Sono mantenuti solo i progetti con costruzione fisica, messa in servizio o apertura nel 2025–2026 documentate e con costi e potenza elettrica specifici del progetto pubblicati. I costi usano l’ambito e la valuta pubblicati; nessuna stima di riferimento né conversione di valuta. MW è capacità di potenza, non produzione annua di elettricità. L’energia annua attesa, dove indicata, è una previsione. Il punto sulla mappa è una posizione segnalata della centrale/del progetto e può essere approssimativo. Le viste di inventario corrispondenti e le proposte di espansione escluse non sono capacità addizionale.
Rendering progettuale della Legend Power Station tratto dal pannello superiore della presentazione di Entergy Texas del 4 febbraio 2026, pagina 10 del PDF. È il pannello di Legend, non il progetto di Lone Star sottostante, e non è una fotografia dell’opera realizzata. Crediti: Entergy Texas, presentazione di Jessica Hill ospitata da TXCPA. Fonte e galleria; media originale.
Power generation754 MW · Planned 754 MW electrical generation in Entergy Texas February 2026 investor presentation (project row). Construction groundbreaking confirmed by operator; in-service target 2028. Not operating generation. Legend is combined cycle. · source