재작성됨 40단어 추가, 29단어 삭제
Clean power developers are advancing the 260M USD, 250 MW utility-scale solar photovoltaic generation center in Beeville, Bee County, Texas, interconnecting to the EIA plant 68347 lists Abeja Solar Farm LLC’s Bee County project at 200 MW, with July 2028 proposed operation and approvals not initiated. The later September 2026 ERCOT South 138/345 kV high-voltage transmission grid.GIS request 27INR0372 instead reports 200.84 MW and June 7, 2029 projected COD.
재작성됨 67단어 추가, 93단어 삭제
The Public Utility Commission of TexasERCOT’s study/IA status and Bee County Commissioners Court approved regulatory filings for the 250 MW Abeja Solar Farm. Deploys 250 MWeffective-date filing notice are not evidence of single-axis tracking bifacial monocrystalline solar panels covering approximately 1,800 acres. Represents an estimated 260 million USD private clean energy development under ERCOT Interconnection Queue 24INR0088. Interconnects to AEP Texas Central 138/345 kV transmission lines near the Beeville switching substation. Supplies low-cost clean electricity, reduces Gulf Coast summer peak prices, and enhances regional grid reliability. Timeline: planned project targeting commercial operation in Novemberoperation. The POI is a 345 kV Paladio–Tango tap, not the invented generic county voltages. The former 250 MW, $260M and November 2028 date are removed; native capacity uses EIA’s 200 MW plant rating, not an unexplained rounded queue figure. Timeline: June 7, 2029 is the later ERCOT projected COD; EIA July 2028 (estimated) under ERCOT interconnection queue and state regulatory schedules.conflicts. Neither date is confirmed operation.