200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"BEACON","summerNetMW":200.0”
2027-09-10; requested date only, not an achieved opening.
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; BEACON.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
이 핀은 뉴스를 계속 추적합니다. 현재까지 알려진 내용을 보여주며, 무엇이 바뀌었고 그 계기가 무엇인지 여기에 표시합니다.
수정됨@ThePinGang님이
MISO regional transmission interconnection development of the Beacon Clean Energy Storage Facility in Mahaska County, Iowa. SupplyingJ3551 is a 200 MW / 800 MWh of lithium-ion energy storage, the facility connects to regional transmission lines near Oskaloosa to absorb surplus wind generation and strengthen southeastern Iowa electrical infrastructure.battery storage interconnection request in Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date.
Developers progressed regulatory filings for the Beacon Clean Energy Storage Facility near OskaloosaJ3551 is a 200 MW battery storage interconnection request in Mahaska County, Iowa. Supplies 200 MW / 800 MWh of grid-scale four-hour battery energy storage. Represents an estimated 210 million USD private clean power investment in southeastern Iowa. Connects to regional high-voltage transmission lines within the MISO market footprint. Absorbs surplus regional wind generation and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date. The point of interconnection is BEACON. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
수정됨@ThePinGang님이
… and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
독자들의 사진으로, 출처가 있는 핀의 미디어와 별도로 표시됩니다. 먹거나 본 것을 평가하고, 레스토랑 핀에서는 사진에 바로 요리를 태그해 보세요.
첫 번째 항목은 항상 핀의 출처입니다. 전체 신뢰도는 각 자료가 위의 시작·종료 시각을 얼마나 확실히 뒷받침하는지에 대한 가중 평균이며, 자료는 최신 자료보다 180일 오래될 때마다 가중치가 절반이 됩니다.
빠지거나 잘못된 점이 있나요? 이 핀을 뒷받침하는 링크, 다른 시작일이나 종료일과 그 이유, 빠지거나 잘못된 사실을 자신의 말로 알려주세요. AI가 이 핀의 출처와 대조하고 더 나은 자료를 찾아, 뒷받침하는 페이지를 추가합니다. 핀 자체의 출처가 여전히 가장 중요하게 반영됩니다. AI는 이미지도 확인합니다. 다른 것을 보여주거나 제대로 보여주지 못하는 이미지는 뒤로 옮기거나 교체합니다.
원본 제목: Beacon: 200 MW Battery Interconnection Request J3551
Power storage200 MW · J3551: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-09-10. Not current measured generation; No annual energy or battery MWh inferred. · source