Energy: photovoltaic generation · 확인일 2026-10-30
확인된 단계만 강조합니다. 수치와 날짜는 계획과 입증된 상태를 구분합니다.
290 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"GALLAGHER - TWINING 138.0kV","summerNetMW":290.0”
2028-11-01; requested date only, not an achieved opening.
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Solar; GALLAGHER - TWINING 138.0kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00"”
이 핀은 뉴스를 계속 추적합니다. 현재까지 알려진 내용을 보여주며, 무엇이 바뀌었고 그 계기가 무엇인지 여기에 표시합니다.
수정됨@ThePinGang님이
Consumers Energy regional transmission development of the Gallagher to Twining Clean Solar ProjectJ3274 is a 290 MW photovoltaic generation interconnection request in Ogemaw County, Michigan. Generating 290 MWac of renewable power, the facility connects to regional 138 kV transmission lines to inject clean electricity into the Michigan lower peninsula grid.Ogemaw, MI. The grid operator lists its queue status as Active. The requested in-service date is 2028-11-01; this is a planning date.
Consumers Energy filed renewable resource applications for the Gallagher to Twining Clean Solar ProjectJ3274 is a 290 MW photovoltaic generation interconnection request in Ogemaw County, Michigan. Delivers 290 MWac of clean utility solar electricity across northern lower Michigan. Represents an estimated 310 million USD clean power infrastructure development. Interconnects to regional 138 kV transmission circuits under MISO oversight. Injects emission-free power into the Michigan lower peninsula grid while generating local tax revenues. Timeline: planned project targeting commercial operation in November 2028 (estimated) under MISO interconnection queue and state regulatory schedules.Ogemaw, MI. The grid operator lists its queue status as Active. The requested in-service date is 2028-11-01; this is a planning date. The point of interconnection is GALLAGHER - TWINING 138.0kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
수정됨@ThePinGang님이
… lower peninsula grid while generating local tax revenues. Timeline: planned project targeting commercial operation in November 2028 (estimated) under MISO interconnection queue and state regulatory schedules.
독자들의 사진으로, 출처가 있는 핀의 미디어와 별도로 표시됩니다. 먹거나 본 것을 평가하고, 레스토랑 핀에서는 사진에 바로 요리를 태그해 보세요.
첫 번째 항목은 항상 핀의 출처입니다. 전체 신뢰도는 각 자료가 위의 시작·종료 시각을 얼마나 확실히 뒷받침하는지에 대한 가중 평균이며, 자료는 최신 자료보다 180일 오래될 때마다 가중치가 절반이 됩니다.
빠지거나 잘못된 점이 있나요? 이 핀을 뒷받침하는 링크, 다른 시작일이나 종료일과 그 이유, 빠지거나 잘못된 사실을 자신의 말로 알려주세요. AI가 이 핀의 출처와 대조하고 더 나은 자료를 찾아, 뒷받침하는 페이지를 추가합니다. 핀 자체의 출처가 여전히 가장 중요하게 반영됩니다. AI는 이미지도 확인합니다. 다른 것을 보여주거나 제대로 보여주지 못하는 이미지는 뒤로 옮기거나 교체합니다.
원본 제목: Gallagher to Twining: 290 MW Solar Interconnection Request J3274
Power generation290 MW · J3274: 290 MW requested photovoltaic generation. Queue status: Active. Requested date: 2028-11-01. Not current measured generation; No annual energy or battery MWh inferred. · source