Energy: battery storage · 확인일 2026-10-30
확인된 단계만 강조합니다. 수치와 날짜는 계획과 입증된 상태를 구분합니다.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"7ASTER - 7CMDR 345.0kV","summerNetMW":200.0”
2027-05-28; requested date only, not an achieved opening.
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00","inService":"2027-05-28T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; 7ASTER - 7CMDR 345.0kV.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00","inService":"2027-05-28T04:00:00+00:00"”
이 핀은 뉴스를 계속 추적합니다. 현재까지 알려진 내용을 보여주며, 무엇이 바뀌었고 그 계기가 무엇인지 여기에 표시합니다.
수정됨@ThePinGang님이
MISO regional transmission interconnection development of the 7Aster to 7Cmdr Energy Storage Facility in Perry County, Illinois. ProvidingS1095 is a 200 MW / 800 MWh of grid-scale battery storage along the 345 kV transmission corridor, the system replaces retired southern Illinois coal capacity with flexible zero-carbon storage dispatch.battery storage interconnection request in Perry, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-05-28; this is a planning date.
Vistra Corp advanced regulatory filings for the 7Aster to 7Cmdr Energy Storage FacilityS1095 is a 200 MW battery storage interconnection request in Perry County, Illinois. Encompasses 200 MW / 800 MWh of advanced lithium-ion energy storage capacity. Represents an estimated 210 million USD clean infrastructure investment in southern Illinois. Interfaces with MISO's 345 kV high-voltage transmission network along State Route 13. Replaces retiring fossil generation with responsive, zero-carbon battery storage dispatch. Timeline: planned project targeting commercial operation in May 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Perry, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-05-28; this is a planning date. The point of interconnection is 7ASTER - 7CMDR 345.0kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
수정됨@ThePinGang님이
… fossil generation with responsive, zero-carbon battery storage dispatch. Timeline: planned project targeting commercial operation in May 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
독자들의 사진으로, 출처가 있는 핀의 미디어와 별도로 표시됩니다. 먹거나 본 것을 평가하고, 레스토랑 핀에서는 사진에 바로 요리를 태그해 보세요.
첫 번째 항목은 항상 핀의 출처입니다. 전체 신뢰도는 각 자료가 위의 시작·종료 시각을 얼마나 확실히 뒷받침하는지에 대한 가중 평균이며, 자료는 최신 자료보다 180일 오래될 때마다 가중치가 절반이 됩니다.
빠지거나 잘못된 점이 있나요? 이 핀을 뒷받침하는 링크, 다른 시작일이나 종료일과 그 이유, 빠지거나 잘못된 사실을 자신의 말로 알려주세요. AI가 이 핀의 출처와 대조하고 더 나은 자료를 찾아, 뒷받침하는 페이지를 추가합니다. 핀 자체의 출처가 여전히 가장 중요하게 반영됩니다. AI는 이미지도 확인합니다. 다른 것을 보여주거나 제대로 보여주지 못하는 이미지는 뒤로 옮기거나 교체합니다.
원본 제목: 7Aster to 7Cmdr: 200 MW Battery Interconnection Request S1095
Power storage200 MW · S1095: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-05-28. Not current measured generation; No annual energy or battery MWh inferred. · source