Energy: photovoltaic generation · 확인일 2026-10-30
확인된 단계만 강조합니다. 수치와 날짜는 계획과 입증된 상태를 구분합니다.
199 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Robinsonville 230 kV","summerNetMW":199.0”
2024-12-01; requested date only, not an achieved opening.
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Robinsonville 230 kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
이 핀은 뉴스를 계속 추적합니다. 현재까지 알려진 내용을 보여주며, 무엇이 바뀌었고 그 계기가 무엇인지 여기에 표시합니다.
수정됨@ThePinGang님이
Tennessee Valley Authority (TVA) transmission-interconnected development of the Robinsonville Clean Solar CenterJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto County, Mississippi. Delivering 199 MWac of clean photovoltaic power, the facility ties to the 230 kV electric grid to provide zero-carbon electricity to northwestern Mississippi communities and commercial developments.DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental assessments for the Robinsonville Clean Solar Center in DeSoto County, Mississippi. Deploys 199 MWac of clean photovoltaic power across northwest Mississippi. RepresentsJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a 220 million USD clean energy infrastructure investment. Interfaces directly with theplanning date. The point of interconnection is Robinsonville 230 kV electric grid along the US Highway 61 corridor. Supplies zero-carbon electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
수정됨@ThePinGang님이
… electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
수정됨@ThePinGang님이
독자들의 사진으로, 출처가 있는 핀의 미디어와 별도로 표시됩니다. 먹거나 본 것을 평가하고, 레스토랑 핀에서는 사진에 바로 요리를 태그해 보세요.
첫 번째 항목은 항상 핀의 출처입니다. 전체 신뢰도는 각 자료가 위의 시작·종료 시각을 얼마나 확실히 뒷받침하는지에 대한 가중 평균이며, 자료는 최신 자료보다 180일 오래될 때마다 가중치가 절반이 됩니다.
빠지거나 잘못된 점이 있나요? 이 핀을 뒷받침하는 링크, 다른 시작일이나 종료일과 그 이유, 빠지거나 잘못된 사실을 자신의 말로 알려주세요. AI가 이 핀의 출처와 대조하고 더 나은 자료를 찾아, 뒷받침하는 페이지를 추가합니다. 핀 자체의 출처가 여전히 가장 중요하게 반영됩니다. AI는 이미지도 확인합니다. 다른 것을 보여주거나 제대로 보여주지 못하는 이미지는 뒤로 옮기거나 교체합니다.
원본 제목: Robinsonville: 199 MW Solar Interconnection Request J2047
Power generation199 MW · J2047: 199 MW requested photovoltaic generation. Queue status: Done. Requested date: 2024-12-01. Not current measured generation; No annual energy or battery MWh inferred. · source