200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hamilton","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hamilton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Pin ini mengikuti berita: ia menunjukkan apa yang diketahui sekarang, dan inilah apa yang berubah serta apa yang menyebabkannya.
Disuntingoleh @ThePinGang
Broad Reach Power development of the Hamilton Clean Energy Storage Facility in Hamilton County, Illinois. TheJ3296 is a 200 MW / 800 MWh grid-scale energy storage project provides critical capacity, frequency response, and local peak load shaving across the Ameren Illinois service territory within the MISO wholesale electricity market.battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
Broad Reach Power advanced engineering and county development reviews for the Hamilton Clean Energy Storage Facility. Features a 200 MW / 800 MWh four-hour utility-scale battery energy storage system. RepresentsJ3296 is a 200 MW battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD capital project supporting grid reliability in southern Illinois. Connects to Ameren Illinois transmission lines serving the wholesale MISO electricity market. Delivers fast-ramping frequency response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hamilton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Disuntingoleh @ThePinGang
… response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Disuntingoleh @ThePinGang
Foto daripada pembaca, berasingan daripada media bersumber pin. Nilaikan apa yang anda makan atau lihat, dan pada pin restoran, tag hidangan terus pada foto anda.
Entri pertama sentiasa sumber pin. Keyakinan keseluruhan ialah purata berpemberat bagi sejauh mana setiap rujukan menyokong masa mula dan tamat yang digunakan di atas; sesebuah rujukan diambil kira separuh kurang bagi setiap 180 hari lebih lama daripada yang terbaharu.
Ada yang tertinggal atau salah? Nyatakan dengan kata-kata anda sendiri: pautan yang menyokong pin ini, tarikh mula atau tamat yang berbeza beserta sebabnya, atau fakta yang tiada atau tersilap. AI menyemaknya berbanding sumber pin ini, mencari yang lebih baik, dan menambah mana-mana halaman yang menyokong anda. Sumber pin itu sendiri tetap paling diambil kira. Gambar yang menunjukkan sesuatu yang lain, atau menunjukkannya dengan buruk, turut dilihat, dan dialihkan ke bawah atau diganti.
Tajuk asal: Hamilton: 200 MW Battery Interconnection Request J3296
Power storage200 MW · J3296: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source