Energy: photovoltaic generation · Disemak 2026-10-30
Hanya peringkat yang dilaporkan diserlahkan. Angka dan tarikh membezakan rancangan daripada hasil dibuktikan.
199 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Robinsonville 230 kV","summerNetMW":199.0”
2024-12-01; requested date only, not an achieved opening.
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Robinsonville 230 kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Pin ini mengikuti berita: ia menunjukkan apa yang diketahui sekarang, dan inilah apa yang berubah serta apa yang menyebabkannya.
Disuntingoleh @ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Robinsonville Clean Solar CenterJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto County, Mississippi. Delivering 199 MWac of clean photovoltaic power, the facility ties to the 230 kV electric grid to provide zero-carbon electricity to northwestern Mississippi communities and commercial developments.DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental assessments for the Robinsonville Clean Solar Center in DeSoto County, Mississippi. Deploys 199 MWac of clean photovoltaic power across northwest Mississippi. RepresentsJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a 220 million USD clean energy infrastructure investment. Interfaces directly with theplanning date. The point of interconnection is Robinsonville 230 kV electric grid along the US Highway 61 corridor. Supplies zero-carbon electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Disuntingoleh @ThePinGang
… electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Disuntingoleh @ThePinGang
Foto daripada pembaca, berasingan daripada media bersumber pin. Nilaikan apa yang anda makan atau lihat, dan pada pin restoran, tag hidangan terus pada foto anda.
Entri pertama sentiasa sumber pin. Keyakinan keseluruhan ialah purata berpemberat bagi sejauh mana setiap rujukan menyokong masa mula dan tamat yang digunakan di atas; sesebuah rujukan diambil kira separuh kurang bagi setiap 180 hari lebih lama daripada yang terbaharu.
Ada yang tertinggal atau salah? Nyatakan dengan kata-kata anda sendiri: pautan yang menyokong pin ini, tarikh mula atau tamat yang berbeza beserta sebabnya, atau fakta yang tiada atau tersilap. AI menyemaknya berbanding sumber pin ini, mencari yang lebih baik, dan menambah mana-mana halaman yang menyokong anda. Sumber pin itu sendiri tetap paling diambil kira. Gambar yang menunjukkan sesuatu yang lain, atau menunjukkannya dengan buruk, turut dilihat, dan dialihkan ke bawah atau diganti.
Tajuk asal: Robinsonville: 199 MW Solar Interconnection Request J2047
Power generation199 MW · J2047: 199 MW requested photovoltaic generation. Queue status: Done. Requested date: 2024-12-01. Not current measured generation; No annual energy or battery MWh inferred. · source