Entri pertama sentiasa sumber pin. Keyakinan keseluruhan ialah purata berpemberat bagi sejauh mana setiap rujukan menyokong masa mula dan tamat yang digunakan di atas; sesebuah rujukan diambil kira separuh kurang bagi setiap 180 hari lebih lama daripada yang terbaharu.
Tarikh pin 2017-12-31 ialah sempadan tahun. Fasa I dijangka pada S3 2017 dan disahkan September 2017, tetapi Fasa II (100 daripada 172 unit) dijangka Ogos 2018 dan disahkan September 2018, jadi penyiapan penuh komuniti 172 unit ialah 2018, bukan 2017.
Phase II: construction summer 2017, EarthCraft certification September 2018.[1]
Phase I: 72 units, construction summer 2016, EarthCraft certification September 2017.[1]
Cost benchmark: “Type V-A Garden, 3-Story $230k–$340k/unit (affordable) 3-story over slab, surface parking, in-unit washer/dryer.”[1]
Project-specific operator, government or project-partner source reviewed on October 10, 2026.[1]
172 mixed-income apartments
“172-unit mixed-income apartment community”
Type V-A Garden, 3-Story (affordable), applied to Savannah, GA. Published type is 3-story garden-style, so building-type row preferred.
“Type V-A Garden, 3-Story $230k–$340k/unit (affordable) 3-story over slab, surface parking, in-unit washer/dryer.”
Top of the same published range.
“Type V-A Garden, 3-Story $230k–$340k/unit (affordable) 3-story over slab, surface parking, in-unit washer/dryer.”
Low: 172 × $230,000 = $39,560,000. High: 172 × $340,000 = $58,480,000.
172 × $285,000 (midpoint per unit) = $49,020,000, rounded to $49 million. About $285,000 per unit.
Land, design and permit fees, financing and the developer fee are excluded, so this is a vertical building cost, not a project budget. The benchmark is a 2026 range with no adjustment for the year this was built. 2017-era build vs 2026 pricing; 35 market-rate homes; land and soft costs excluded. No construction budget was found for this project.
172 mixed-income apartments
“172-unit mixed-income apartment community”
Summer 2016 to 2018
“Construction began in the summer of 2016. The View at Oglethorpe (Phase 1) was awarded the EarthCraft Multifamily Certification in September, 2017.”
Newly constructed, leasing
“newly constructed ... Three-story, garden-style apartment buildings”
Housing Authority of Savannah selects Hunt as development partner
“HAS selected Hunt as its development partner in 2014.”
Phase I construction begins (72 units)
“Construction began in the summer of 2016.”
Phase II financial closing on 100 units
“announced the successful closing on 100 units as part of the Phase II redevelopment of the former Robert Hitch Village”
Phase I EarthCraft certification (completed building)
“Construction began in the summer of 2016. The View at Oglethorpe (Phase 1) was awarded the EarthCraft Multifamily Certification in September, 2017.”
Phase II EarthCraft certification (completed building)
“Construction began in the summer of 2017. The View at Oglethorpe (Phase II) was awarded the EarthCraft Multifamily Certification in September, 2018.”
Ada yang tertinggal atau salah? Nyatakan dengan kata-kata anda sendiri: pautan yang menyokong pin ini, tarikh mula atau tamat yang berbeza beserta sebabnya, atau fakta yang tiada atau tersilap. AI menyemaknya berbanding sumber pin ini, mencari yang lebih baik, dan menambah mana-mana halaman yang menyokong anda. Sumber pin itu sendiri tetap paling diambil kira. Gambar yang menunjukkan sesuatu yang lain, atau menunjukkannya dengan buruk, turut dilihat, dan dialihkan ke bawah atau diganti.
Tajuk asal: The View at Oglethorpe — Savannah affordable housing
Tarikh pembukaan: siap 2017 (ketepatan tahun; tiada hari tepat diterbitkan). Sumber: The View at Oglethorpe (Synergy Custom Services menyiapkan projek, 2017). Penyenaraian operator dan dokumen program terakhir disemak pada 10 Oktober 2026.
Senarai menunggu dua bilik tidur dibuka. Telefon pajakan: 912.319.7948. Maklumat permohonan / senarai tunggu.
Sewa dolar tidak disahkan dalam sumber khusus projek yang disemak. Had pendapatan tidak menetapkan sewa bulanan tetap. Rujuk maklumat pajakan hartanah yang dipautkan.
Tiada belanjawan pembinaan ditemui untuk projek ini, jadi harga adalah anggaran yang dibina daripada input yang diterbitkan, bukan angka yang dilaporkan. kerja:
Tiada jumlah kos pembangunan telah diterbitkan untuk mana-mana fasa; pin menyimpan anggaran penanda aras berlabelnya.
Stated by the source · 172 units as stated in the source.