Documented physical milestone or dated progress/reporting marker. Period-end dates represent only the reported month/quarter; they do not invent an exact operation date. Source estimates are labelled and not treated as confirmed future opening dates.
ACCIONA’s project community page publishes a A$500 million cost for the 480 MWp Aldoga solar farm. This is project investment, separate from its A$150 million local procurement opportunities. Aldoga solar farm: published generating capacity 480 MW. 480 MWp solar DC peak rating; inventory 380 MW is a different rating
ACCIONA[2] December 10, 2025 confirms commercial operation of the 480 MWp solar farm after construction began April 2024.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
ACCIONA’s project community page publishes a A$500 million cost for the 480 MWp Aldoga solar farm. This is project investment, separate from its A$150 million local procurement opportunities.[2][3]
ACCIONA’s project community page publishes a A$500 million cost for the 480 MWp Aldoga solar farm. This is project investment, separate from its A$150 million local procurement opportunities. Aldoga solar farm: published generating capacity 480 MW. 480 MWp solar DC peak rating; inventory 380 MW is a different rating[2]
ACCIONA December 10, 2025 confirms commercial operation of the 480 MWp solar farm after construction began April 2024.[3]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Aldoga solar farm, shown in the operator’s December 2025 commercial-operation announcement. Credit: ACCIONA Energía; photographer not named on source page. Operator source page; original image.