NLC India Limited’s published video presenting NUPPL’s 1,980 MW Ghatampur Supercritical Thermal Power Project. Publisher and title verified through YouTube’s public metadata.
India’s May 30, 2025 government release publishes total project cost ₹21,780.94 crore (INR217,809,400,000) for three 660 MW units, totaling 1,980 MW. The budget covers the full three-unit built project, not just the first unit inaugurated that day. Ghatampur thermal power project: published generating capacity 1980 MW. Operator-reported electric generating capacity; not annual energy production Unit 1 was dedicated May 30, 2025; the remaining units were physically being completed with FY2025–26 commissioning targets. Later inventory records report two recent operating units; the full project is retained as construction/recent operation, without asserting a completion day for Unit 3.[1]
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
India’s May 30, 2025 government release publishes total project cost ₹21,780.94 crore (INR217,809,400,000) for three 660 MW units, totaling 1,980 MW. The budget covers the full three-unit built project, not just the first unit inaugurated that day.[3]
India’s May 30, 2025 government release publishes total project cost ₹21,780.94 crore (INR217,809,400,000) for three 660 MW units, totaling 1,980 MW. The budget covers the full three-unit built project, not just the first unit inaugurated that day. Ghatampur thermal power project: published generating capacity 1980 MW. Operator-reported electric generating capacity; not annual energy production Unit 1 was dedicated May 30, 2025; the remaining units were physically being completed with FY2025–26 commissioning targets. Later inventory records report two recent operating units; the full project is retained as construction/recent operation, without asserting a completion day for Unit 3.[3]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
NLC India Limited’s published video presenting NUPPL’s 1,980 MW Ghatampur Supercritical Thermal Power Project. Publisher and title verified through YouTube’s public metadata. Credit: NLC India Limited. Source and gallery; original media.