The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Documented physical milestone or dated progress/reporting marker. Period-end dates represent only the reported month/quarter; they do not invent an exact operation date. Source estimates are labelled and not treated as confirmed future opening dates.
Entergy’s[3] FY2025 Form 10-K repeats its October 2022 estimated US$1.55 billion fixed-pricing option for Orange County Advanced Power Station. This is the historical 2022 estimate disclosed in the 2026 report; no current final outturn cost is asserted. It excludes the optional hydrogen co-firing investment under the regulatory approval.
Orange County Advanced Power Station: 1215 MW generating project rating. Operator-reported electric generating capacity; not annual energy production Entergy April 23, 2026 confirms first fire and continued commissioning, with operator generating capacity approximately 1,215 MW. First fire is not commercial operation; the historical late-summer 2026 target is not proof of COD.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Entergy’s FY2025 Form 10-K repeats its October 2022 estimated US$1.55 billion fixed-pricing option for Orange County Advanced Power Station. This is the historical 2022 estimate disclosed in the 2026 report; no current final outturn cost is asserted. It excludes the optional hydrogen co-firing investment under the regulatory approval.[2][3]
Entergy’s FY2025 Form 10-K repeats its October 2022 estimated US$1.55 billion fixed-pricing option for Orange County Advanced Power Station. This is the historical 2022 estimate disclosed in the 2026 report; no current final outturn cost is asserted. It excludes the optional hydrogen co-firing investment under the regulatory approval.[2]
Orange County Advanced Power Station: 1215 MW generating project rating. Operator-reported electric generating capacity; not annual energy production Entergy April 23, 2026 confirms first fire and continued commissioning, with operator generating capacity approximately 1,215 MW. First fire is not commercial operation; the historical late-summer 2026 target is not proof of COD.[3]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Orange County Advanced Power Station first-fire milestone image supplied by Entergy, April 2026. Credit: Entergy; individual photographer not named. Source and gallery; original media.
Orange County Advanced Power Station aerial construction view identified by Entergy as November 2025. Credit: Entergy; individual photographer not named. Source and gallery; original media.