The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Documented physical milestone or dated progress/reporting marker. Period-end dates represent only the reported month/quarter; they do not invent an exact operation date. Source estimates are labelled and not treated as confirmed future opening dates.
Mammoth North early construction aerial from Doral’s project gallery. This shows the older North phase, not the 900 MW South/Central phases now reaching operation.[1]
Indiana Economic Development’s November 3, 2022 release publishes US$1.5 billion original full-complex investment for 1.3 GW Mammoth Solar. This dated estimate includes the earlier 400 MW North phase, as well as the 900 MW later phases; it is not a stand-alone budget for the new 900 MW and is not a refreshed 2026 outturn. Mammoth Solar — original 1.3 GW complex: 1300 MW generating project rating. Full original complex 1,300 MW; 900 MWac final phases commissioning in 2026[1]
Doral’s October 7, 2026 announcement confirms 900 MWac in the final South, Central I and Central II phases constructed over 18 months and nearing commercial operation. Full-complex rated output is 1.3 GW; 900 MW is the 2026 commissioning addition. The announced future expansion to 2,245 MW is excluded.[1]
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Indiana Economic Development’s November 3, 2022 release publishes US$1.5 billion original full-complex investment for 1.3 GW Mammoth Solar. This dated estimate includes the earlier 400 MW North phase, as well as the 900 MW later phases; it is not a stand-alone budget for the new 900 MW and is not a refreshed 2026 outturn.[3][4]
Indiana Economic Development’s November 3, 2022 release publishes US$1.5 billion original full-complex investment for 1.3 GW Mammoth Solar. This dated estimate includes the earlier 400 MW North phase, as well as the 900 MW later phases; it is not a stand-alone budget for the new 900 MW and is not a refreshed 2026 outturn. Mammoth Solar — original 1.3 GW complex: 1300 MW generating project rating. Full original complex 1,300 MW; 900 MWac final phases commissioning in 2026[3]
Doral’s October 7, 2026 announcement confirms 900 MWac in the final South, Central I and Central II phases constructed over 18 months and nearing commercial operation. Full-complex rated output is 1.3 GW; 900 MW is the 2026 commissioning addition. The announced future expansion to 2,245 MW is excluded.[4]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.
Mammoth North early construction aerial from Doral’s project gallery. This shows the older North phase, not the 900 MW South/Central phases now reaching operation. Credit: Doral Group / Doral Renewables; photographer not named. Source and gallery; original media.
Mammoth South groundbreaking ceremony from Doral’s official project gallery; an event photo from the phase launch, not a completed solar-field view. Credit: Doral Group / Doral Renewables; photographer not named. Source and gallery; original media.
Group at Mammoth South’s solar project, from Doral’s official project gallery. Capture date not independently published; it does not establish today’s completion percentage. Credit: Doral Group / Doral Renewables; photographer not named. Source and gallery; original media.
Power generation1.3 GW · source