Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Translations completed using Gemini 3.8 Flash.
Power generation600 MW · Sourced proposal/study scope; not measured output or evidence of operation. MISO lists a 600 MW solar request J2519 at Smalling in Richland Parish, Louisiana, with October 31, 2026 inService date, Phase 2 study and Not Started post-GIA status. This is a queue target · source