Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Translations completed using Gemini 3.8 Flash.
Power generation500 MW · Proposed/studied scope, not measured output or evidence of operation. MISO’s active J3931 request is a 500 MW photovoltaic project in Jasper County, Indiana, targeting September 30, 2030. It is in DPP-2025 Phase 1 with POI recorded only as · source